
DigitalFlow™ GC868 Programming Manual (2-Channel)
C-12
Appendix C. Programming with PanaView
C.6 Changing Meter
Settings
Through PanaView, GC868 users can handle remote programming of the meter.
They can:
•
Program and change a meter’s operating parameters;
•
Set up, start, and stop logs;
•
Calibrate and test inputs and outputs;
•
Clear various files.
To access meter programming:
1.
Enter the
New Meter Browser
option from the “File” menu.
2. Expand the network tree until you reach the desired meter.
3. Then expand the meter tree as shown in Figure C-18 below.
Figure C-18: New Meter Browser with Meter Branch
4. From the meter tree, expand the
Edit Functions
option. The window now appears
similar to Figure C-19 below, with a list of available menus. The menus listed are
those available on the meter.
Figure C-19: Meter Tree with Edit Functions Option
5. To open a particular menu, double-click on that menu on the tree. For example, if
you double-click on the Site Edit Menu, a window opens similar to Figure C-20
below.
Содержание DigitalFlow GC868
Страница 2: ......
Страница 4: ...ii no content intended for this page...
Страница 6: ...Warranty iv DigitalFlow GC868 Programming Manual 2 Channel no content intended for this page...
Страница 10: ...Contents viii DigitalFlow GC868 Programming Manual 2 Channel no content intended for this page...
Страница 78: ...Chapter 5 Clearing Data 5 3 DigitalFlow GC868 Programming Manual 2 Channel no content intended for this page...
Страница 90: ...Appendix A Menu Maps A 1 DigitalFlow GC868 Programming Manual 2 Channel no content intended for this page...
Страница 130: ...Index 4 DigitalFlow GC868 Programming Manual 2 Channel no content intended for this page...