OPERATION/MAINTENANCE
LOAD/EDIT LINK is used to change the link name and date of test for STORED LINKS in the Fiber OWL 4. From this menu, STORED
LINKS can be edited and/or loaded into memory.
loads the highlighted STORED LINK into memory. The configuration of the
currently loaded STORED LINK will be applied to any test result that is stored
while that link is loaded.
changes the name and/or test date of the selected STORED LINK.
From
scrolls through the list of STORED LINKS.
If the link name or date of test does not appear correctly on certification reports, use the RENAME option to
quickly change the link name or date of test without having to re-run the Link Wizard.
From the FIBER LINK MENU, press
to LOAD/EDIT the link. The STORED LINKS menu will appear.
the STORED LINKS menu, press
to scroll through the list of STORED LINKS and highlight the link name you
wish to use. The currently loaded link is denoted by an asterisk.
Press
to edit the link information.
Edit the LINK NAME by pressing
. It is recommended to change the link name to
better describe the link. The link name field can support up to 14-character names.
Press
when finished entering the LINK NAME.
Edit the DATE by pressing
. It is of vital importance to change the date using the
format
MM-DD-YY
. If the date is entered incorrectly, or not entered at all, OWL Reporter will display
an incorrect date on the software and reports.
Press
when finished entering the date, then press
again to return to the STORED
LINKS menu.
Press
to load the link, and return to the FIBER LINK MENU.
2
DEF
F1
F2
F3
F1
F3
F1
DONE
F2
DONE
DONE
F2
LOADING AND EDITING STORED LINKS
Link Information
NAME
ACME
DATE
CORP.
02-26-07
_____________________
LINK
STORED LINKS
MENU
NEXT
STORED
_____________________
SELECT
LINKS
Fiber Link #1
Fiber Link #2
Fiber Link #3
Fiber Link #4
*
RENAME
Edit Link Name
<---
SHIFT
--->
[Fiber Link #1
]
LINK NAME:
_____________________
Edit Link Date
<---
SHIFT
--->
[01/01/01]
DATE:
_____________________