20 LaserMatrix Floor Model Stacker
To install the wedge and auxiliary paper guide —
1.
Snap wedge onto wireform of paper stacker.
It’s easiest if you snap in one side first and then slightly
compress the wedge to fit the other side.
2.
Push the wedge against the main paper guide.
3.
Slip auxiliary paper guide into paper stacker channels so
that it rests on top of paper stack support. Butt the
auxiliary guide against wedge.
With all parts assembled, the distance between the main
and auxiliary paper guides should be about 9
3
/
4
in.
4.
Continue with “Operation,” which follows.
OPERATION
OPERATION
OPERATION
OPERATION
1.
Adjust position of paper stacker so that the face of the
main paper guide is approximately at edge of paper.
2.
Now slide refolding units so that indicator marks at
bottom of units point to the proper perf-to-perf form
length marked on the deck.
The refolding units are mounted on a rack and pinion
mechanism so that they move as a unit. When you adjust
one, the other automatically adjusts to the same
complementary position.
NOTE: The positioning of the refolding units is critical
for fault-free performance.
Содержание LaserMatrix Floor Model Stacker
Страница 7: ...LaserMatrix Floor Model Stacker 5 9 Lift refolding deck off cardboard pad Save all packing materials...
Страница 15: ...LaserMatrix Floor Model Stacker 13 LB0 H1...
Страница 32: ......