Note:
The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level
foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can
be concrete pads or patio stones positioned
underneath the floor runners.
10.
With Floor Runners attached, carefully flip the
floor over and place on your foundation.
Caution-
you will need 2 people to assist you. Be careful
when laying floor down not to bend or twist floor.
When in place, level floor completely.
Concrete Slab
Foundation
Foundations
9.
Complete all Floor Runners.
11.
Position
Plywood Floor
pieces (6) on top of
completed floor joists. Plywood will sit flush with outside
of floor joist frame. The Plywood is cut slightly smaller
than floor framing. Keep plywood seams tight.
Hint:
Use a chalk line
to mark location of
floor joists to
determine screw
placement.
Front
12.
With Plywood positioned correctly on floor
framing, attach with 1 1/4” screws. Use screws
every 16”.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 6
plywood
pushed together
at seam.
centered on
floor frame.