49.
Locate Middle Roof Panel and
place on middle rafters.
50.
With Middle Roof Panel aligned as per
Step 48
,
tack panel down to rafters with 2 - 2.5” screws in the
bottom row of shingles.
51.
Lift up, position and attach 2nd Outside Roof Panel on Rafters as per
Step 48
.
Roof Batten flush
with rafter end.
48.
Place Outside Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter). Lowest
batten on roof should be flush with end of rafter at bottom. From the outside, screw down through bottom
and top row of shingles into rafter with 2 - 2.5” screw.
Shingles overhang battens
on Outside Roof Panel.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 21