42.
Place 2nd completed Rafter Section on gable wall framing. Position as per
Steps 39 & 40.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19
Gable Notch
Ridge
Board
Rafter
Offsetting Metal
Ridge Board
Connectors
43.
At the peak, align Ridge Boards so they
are flush together and secure them with
12 - 1 1/4” screws.
Important
- if there is a
gap between Ridge Boards, try pushing side
walls closer together from outside. Walls
should be 91” apart at top from inside of wall
plate to wall plate.
To completely secure Ridge Boards, place
4 - 1 1/4” screws into any of the remaining
Metal Ridge Board Connectors holes.
Complete both sides.
Important:
- If Gable framing does not
line up with Rafters, remove temporary 2”
screws from gable framing. Re-align
gable and secure with 8 - 2” screws total.
44.
With both Rafter Ridge Boards
connected. Completely secure
Gable framing to both outside rafters
with 8 - 2” screws per gable side.