background image

P 1

03BRN0807-V4

8X7 BOURNEMOUTH SUMMERHOUSE

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

Содержание BOURNEMOUTH 03BRN0807-V4

Страница 1: ...can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm ...

Страница 2: ... your building MADE IN GREAT BRITAIN Door Gable Plain Side QTY 2 Plain Gable Floor Roof Sheet QTY 2 Ridge Bar 2067mm Eaves Frame 2750 mm QTY 2 Cover Trim 1682mm QTY 4 Fascia 1192mm QTY 4 Angled Fascia Block 340mm Fascia Block 140mm Finial QTY 2 L Bracket QTY 2 Butt Hinge QTY 6 Turn Button QTY 2 Barrel Bolt QTY 2 Presslock Door Handle QTY 2 Step 1 Place the floor onto a firm and level base Ensure t...

Страница 3: ...50mm screws as shown in the illustration making sure the gable sits inside the panel Do not secure the building to the floor until the roof is fitted 9x50mm Screws 10 18 Step 5 Attach the L brackets centrally to the ridge bar using 2x30mm screws per bracket Measure 67mm from each side of the ridge bar and mark with a pencil Align the front edge of the bracket with the pencil mark as shown in the i...

Страница 4: ...Place the assembled roof panels onto the building as shown in the illustration Fix into place using 8x30mm screws per side ensuring the roofs are flush with the top of the gables The roof panels should be level with the back of the building leaving an overhang over the front 20x30mm Screws Pre drill hole 30mm screw Step 9 Once the roof is fixed in place secure the building to the floor using 18x50...

Страница 5: ... the door gable as shown in the illustration Ensure the veranda floor sits centrally to the building Step 13 Align the veranda sides against the door gable and flush to ends of the veranda floor secure to the building and to veranda floor with 6x50mm screws per side as shown in the illustration 12x50mm Screws Pre drill hole 50mm screw 17 Step 14 Place the veranda frame underneath the roof overhang...

Страница 6: ...lease retain product label and instructions for future reference 13 13 13 13 16 Step 16 Fix the fascias and finials to the building using 6x40mm screws per side ensuring to screw through the boards into the fascia blocks 12x40mm Screws Pre drill hole 40mm screw Step 17 Attach the door handles to the doors using the 35mm bolts included with the door handle Pre drill a hole approximately 3mm and fix...

Страница 7: ... on glazing and carefuly peel covering back 22 Step 18 Fix the presslock to the inside of the master door making sure to align the barrel and the key hole Secure to the master door with 4x16mm screws Ensure the key turns fully without any restrictions 4x16mm Screws Pre drill hole 16mm screw Step 19 Attach to the barrel bolts to the top and bottom of the slave door using 4x10mm screws per bolt Mark...

Отзывы: