25.
When all walls are attached togeth-
er, check alignment with the floor. Bottom
wall framing should sit flush with outside
of floor joists and plywood floor. Confirm
67” wide door opening at bottom.
When positioned correctly, fasten bottom
wall plates to floor using 4 - 2 1/2” screws
per wall panel.
26.
Position
Front Top Plates
on top of
wall studs so it is flush on the inside with
2x3 wall plate. There are 3 pieces of
Front Top Plates ( 2 angle cut /1 end
pieces and 1 middle straight cut /both
ends). Together, the plates should be
centered evenly on the wall left to right.
Attach by screwing down into top wall
framing with 4 - 2” screws.
Angle cut on ends.
Top Plates should be flush
with inside of wall framing.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12
Confirm 67” Wide Door Opening at Bottom
Caulking
Optional
- Caulking
seams will help prevent
moisture from entering at
seam.
Caulking not included in
kit.
Floor
Angle
screws into perimeter
Floor Joists.