Installation Requirements & Cautions
Use only chimneys suitable for solid fuel. Contact your dealer for in-
structions if additional chimney is needed . Do not connect to a chimney
flue serving another appliance. Use only non-combustible materials with
adequate support for a base. Maintain the following clearance to combus-
tibles.
Sides=36” Front=48” Top=12” Chimney connection=18”
Adhere to minimal clearances or fire may result!
This unit may not be connected to an existing boiler system unless a suit-
able water to water exchanger is used.
This unit shall be installed without interfering with the normal delivery of
heated water from the original boiler.
This unit shall be installed without affecting the operation of electrical and
mechanical safety controls of the original boiler.
Installation of this unit shall provide for a change over from one fuel to an-
other without requiring manual adjustment of any controls or components
other than the thermostats.
Maintain adequate water capacity in this unit to prevent damage in the ad-
vent of a power failure.
Do not change the function of any controls or rewire the original boiler. A
wiring interconnection is permitted. The electrical system of both boilers
must be powered from a singe branch circuit without exception.
The operation of a gas boiler must be verified for acceptable operation be-
fore and after installation of this unit by a gas fitter who is recognized by
the regulatory authority.
Installation should comply with requirements of CAN/CSA-B365, and
changes to the installation should comply with CSA B139 (for oil-fired),
C22.1 (for electric) or CAN/CGA-B149.1 or CAN/CGA-B149.2 (for gas-
fired)
!
SAVE THESE INSTRUCTIONS
Installation with existing boiler