Everest Fireplace Installation and Operation Manual
74 ______________________________________________________________________________
APPENDIX 8: OPTIONAL HOT AIR GRAVITY DISTRIBUTION
The kit includes:
-
2 x hot air outlets: grilles
(A) and frames (B);
-
2 x 90
o
elbows (C);
-
6 x steel brackets (D) with
fastening screws (E) and
self-tapping screws (F)
Parts not included in the kit:
-
2 x 8” rigid ducting
made
of 28-gauge galvanized
steel or a UL 181, CAN\ULC
S110 certified ducts. (G)