
INTRODUCTION
To The Dealer:
Inspect the implement thoroughly after assembly to be certain it is functioning properly before delivering it to the customer. The
following checklist is a reminder of points to cover. Check off each item as it is found satisfactory or after proper adjustment is
made.
Pre-Delivery Checklist
1. All Hardware properly tightened.
2. Lubrication of grease fittings.
3. All decals properly located and readable.
4. All implement tools and options are installed and set.
5. Check overall condition of implement.
6. Make sure Operator’s manual is included.
Date Set Up.
Signature.
Delivery
Review the operator’s manual with the customer. Explain the following:
1. Introduce the machine to the customer. Give the customer this manual and encourage them to read it.
2. Make the customer aware of all the safety precautions that must be exercised when using and transporting this
machine.
3. Make customer aware of the different tooling options available.
4. This machine does not come set to run in the field from the factory. The Field settings section in this manual is
meant to help set the machine for optimal performance. Explain all operating adjustments.
5. Explain to the customer that the life expectancy of this machine depends on regular maintenance as directed in
this manual.
6. Tell the customer to use the proper tools for service and make them aware of Orthman parts availability.
7. Write machine model number and serial number in the spaces provided below.
Date delivered.
Signature.
Model Number.
Serial Number.
1 - 2