7.3. Busbar coupling function operation sequence (cpg
.0-c
)
The following sequences are based on the instructions
given for the operation of the busbar disconnector
and circuit breaker in the previous sections.
The initial situation for the different operations is
considered to be where both the busbar disconnectors
and the vacuum interrupter are open.
a. Busbar coupling operations
1.
Close the right busbar disconnector.
Figure 7.26.
Busbar coupling sequence (i)
IG-196-US version 03; 13/04/2021
36
Operation and commissioning sequence
General instructions
cpg
.0 NEW MODEL: Medium-voltage
metal-enclosed switchgear with full insulation in gas,
up to 38 kV in accordance with IEEE Standards