OPTIMUM
M A S C H I N E N - G E R M A N Y
Assembly
Version 1.0.3 dated July 22, 2014
Page 23
Original operating instructions
B30 VGM
US
Position the geared drill on the provided foundation.
Secure the geared drill using the provided through holes on the machine base.
WARNING!
The quality of the foundation and the method used to mount the machine base with the
foundation must be sufficiently stable to bear the load of the geared drill. The foundation
must be even with the ground. Check if the foundation of the geared drill is leveled by
means of a level.
3.6
Securing
In order to achieve the necessary stability of the geared drill, the base of the machine must be
firmly bolted to the foundation. We recommend you to use anchor cartridges respectively heavy
duty anchors.
Secure the base of the geared drill
to the foundation by bolting
through the provided through
holes.
The through holes are marked
with arrows on the machine base.
Img.3-2:
Marking the fastening points
Img.3-3: Example floor anchoring
ATTENTION!
Only tighten the fastening screws on the geared drill in a way that it is safely fixed and
cannot break away or tilt over during operation.
If the fastening screws are too tight or if the machine is fixed on an uneven foundation it may
result in a fracture of the machine base.
Pointer
Through
hole