Version 1.1.8 - 2021-7-29
76
Translation of original instructions
MB4P
ǀ
MB4PV
EN
MB4P_
M
B4PV
_GB
_1.
fm
1.14
Using lifting equipment
WARNING!
The use of unstable lifting and load suspension equipment that might break under load
can cause severe injuries or even death.
Check that the lifting and load-suspension equipment are of sufficient load-bearing
capability and are in perfect condition.
Observe the accident prevention regulations issued by your Employers Liability
Insurance Association or other supervisory authorities responsible for your company.
Fasten the loads properly.
Never walk under suspended loads!
1.15
Signs on the drilling-milling machine
Make sure that the command and warning symbols are readable.
1.16
Electrical system
Have the machine and/or the electric equipment checked regularly. Immediately eliminate all
defects such as loose connections, defective wires, etc.
A second person must be present during work on live components to disconnect the power in
the event of an emergency. Disconnect the Drehmaschine immediately if there is a malfunction
in the power supply!
Comply with the required inspection intervals in accordance with the factory safety directive,
operating equipment inspection DGUV, formerly BVG.
The operator of the machine must ensure that the electrical systems and operating equipment
are inspected with regards to their proper condition, namely,
by a qualified electrician or under the supervision and direction of a qualified electrician,
prior to initial commissioning and after modifications or repairs, prior to recommissioning
and at certain intervals.
The deadlines must be set so that arising, foreseeable defects can be detected in time.
The relevant electro-technical rules must be followed during the inspection.
The inspection prior to initial commissioning is not required if the operator receives confirmation
from the manufacturer or installer that the electrical systems and operating equipment comply
with the accident prevention regulations, see conformity declaration.
Permanently installed electrical systems and operating equipment are considered constantly
monitored if they are continually serviced by qualified electricians and inspected by means of
measurements in the scope of operation (e.g. monitoring the insulation resistance).
1.17
Inspection deadlines
Define and document the inspection deadlines for the machine in accordance with § 3 of the
Factory Safety Act and perform an operational risk analysis in accordance with § 6 of the Work
Safety Act. Also use the inspection intervals in the maintenance section as reference values.
Содержание 3338460
Страница 125: ...Version 1 1 8 2021 07 29 125 Originalbetriebsanleitung MP4P ǀ MB4PV DE EN MB4P_MB4PV_parts fm B Fräskopf Milling head ...
Страница 134: ...Version 1 1 8 2021 07 29 134 Originalbetriebsanleitung MP4P ǀ MB4PV DE EN MB4P_MB4PV_parts fm G ...
Страница 137: ...Version 1 1 8 2021 07 29 137 Originalbetriebsanleitung MP4P ǀ MB4PV DE EN MB4P_MB4PV_parts fm I ...
Страница 139: ...Version 1 1 8 2021 07 29 139 Originalbetriebsanleitung MP4P ǀ MB4PV DE EN MB4P_MB4PV_parts fm K ...
Страница 141: ...Version 1 1 8 2021 07 29 141 Originalbetriebsanleitung V 99 DE GB V99_parts fm 8 9 Ersatzteile Spare parts V99 ...