Translation of original operating instruction
GT22
EN
GT22_G
B_3
.f
m
For lifting with a crane, first mount the transport bolts on the base of the machine. Then attach
the steel cables to the bolts and hook.
Pay particular attention when transporting with a crane:
Raise the machine at the lowest possible speed.
Make sure the machine is balanced.
Cover the machine in places where contact with the transport cables may occur.
The transport cables must not touch the machine saddle to avoid damaging the saddle
guides.
During transport, no persons may stay closer than 2 metres to the machine.
During transport of the machine with a forklift truck or crane, there must be no stops or move-
ments of the machine.
3.3
Set-up and assembly
ATTENTION!
Before you set up the machine, have the load-bearing capacity of the ground checked by
a specialist. The floor or the hall ceiling must bear the weight of the machine plus all
additional parts and units, as well as operators and stored materials. If necessary, the
foundation must be reinforced.
3.4
Installation site requirements
When using liquid grinding additive or coolant lubricant:
In order to achieve sufficient safety against falls by slipping, the accessible area in the mechani-
cal machining zone of the machine must be equipped with a slip resistance. The slip resistant
mat and/or the slip resistant floor must be at least R11 according to BGR 181.
The used shoes must be suitable for being used in those machining areas. The accessible
areas must be cleaned.