Unpacking the machine
INFORMATION
The drilling milling machine is delivered pre-assembled.
Transport the drilling milling machine in its packing crate near its final installation location with a
lift truck before unpacking it. If the packaging shows signs of having possibly been damaged
during transport, take the appropriate precautions to prevent the machine being damaged when
unpacking. If damage is discovered, the carrier and/or shipper must be notified immediately so
the necessary steps can be taken to register a complaint.
Examine the complete machine carefully and check whether all materials, such as shipping
documents, instructions and accessories have been delivered with the machine.
3.3
Scope of delivery
Some of the components shown below can also be already mounted on the machine at factory.
3.3.1
Accessories
- (1) Draw bar M16
- (2) Hand crank for height adjustment of spindle
head
- (3) Oil bottle for oiler
- (4) Toothed rim drill chuck B18 ; 1 - 13mm
- (5) Drill drift
- (6) 2 x T-slot screw M12x55
- (7) Adapter MT4 / B18
- (8) Reducing sleeve MT4 / MT3
- Operating instructions in printed form
3.4
Installation and assembly
3.4.1
Requirements regarding the installation site
Organize the working area around the drilling milling machine according to the local safety reg-
ulations.
Installation plan DH 40CT | DH40CTP on page 20
The work area for operation, maintenance and repair must not be restrictive.
INFORMATION
The power plug of the drilling milling machine must be readily accessible.
3.4.2
Load suspension point
Fasten the load end agent on the an adequate conveyor equipment, for instance a crane.
Fix the load lifting gear around the spindle head.
1