Service Manual version 1008
OP 1200/1500/1700 (PC920 Intel 945G)
5-51
5.2.9.7. Power Supply Integration
19. Integrate the power supply module (9) to the
PC’s chassis and retain them together with three
FMS M3*5 screws.
20. Connect the power switch cable to
CN3
on the
motherboard.
21. Plug the ATX 10P*2 power cable to the ATX
power connector,
ATXP2
on the motherboard.
22. Plug the ATX12V 2P*2 power cable to the
ATX12V power connector,
ATXP1
on the
motherboard.
23. Connect the big 4-pole end of the power cable to
the HDD.
24. Connect the small 4-pole end of the power cable
to the CD-ROM board.
5.2.9.8. Riser Card Integration
25. Have the riser card module (10) firmly plugged to
the ESIA slot on the motherboard.
5.2.9.9. Inverter Cover Integration
26. Retain the inverter cover (11) to the left side of the
chassis with eight FMS M3*5 screws.
5.2.9.10. I/O Cover Integration
27. Plug the I/O module (12) to the
IOINF1
slot on the
motherboard and retain it to the chassis with nine
FMS M3*5 screws.
5.2.9.11. I/O Cover Integration
28. Plug the I/O module to the
IOINF1
slot on the
motherboard and retain it to the chassis with nine
FMS M3*5 screws.
(9)
FMS 3*5 (4)
(10)
(11)
FMS 3*5 (8)
(12)
FMS 3*5 (9)
Содержание OP 1200
Страница 8: ......
Страница 32: ...Service Manual version 1008 OP 1200 1500 1700 PC920 Intel 945G 4 24...
Страница 79: ...Service Manual version 1008 OP 1200 1500 1700 PC920 Intel 945G 6 71...
Страница 91: ...Service Manual version 1008 OP 1200 1500 1700 PC920 Intel 945G 7 83...
Страница 106: ...Service Manual version 1008 OP 1200 1500 1700 PC920 Intel 945G 7 98...
Страница 109: ...Service Manual version 1008 OP 1200 1500 1700 PC920 Intel 945G 7 101...
Страница 112: ...Service Manual version 1008 OP 1200 1500 1700 PC920 Intel 945G 7 104...