11-1 Checkout Procedure
11 Checkout and Test Procedures
24
11 Checkout and Test Procedures
11-1 Checkout Procedure
Once the F3SL system has been configured, mounted, aligned and properly connected to the machine control
system, the initial Checkout Procedure detailed in Appendix A must be performed by qualified personnel. A copy
of the checkout results should be kept with the machine records.
11-2 Test Procedure
The Test Procedure must be performed by qualified personnel. To test the F3SL system with Exact Channel
Select and Floating Blanking disabled, use the OMRON-supplied test object. For applications where Exact
Channel Select or Floating Blanking are enabled, see Table 5-4 to determine the proper size test object.
11-3 Using the Test Object
When using the test object, guide it through the detection zone as shown below.
Figure 11-1 Test Object Pattern
12 Cleaning
Accumulation of oil, dirt and grease on the front filter of the F3SL emitter and receiver can effect the system op-
eration. Clean filters with a mild detergent or glass cleaner. Use a clean, soft, lint-free cloth. Painted F3SL sur-
faces may be cleaned with a mild de-greasing cleaner or detergent.
WARNING
The tests outlined in the Test Procedure in Appendix B must be performed at installation, according to the
employer’s regular inspection program and after any maintenance, tooling change, set up, adjustment, or
modification to the F3SL system or the guarded machine. Where a guarded machine is used by multiple
operators or shifts, it is suggested that the test procedure be performed at each shift or operation change.
Testing ensures that the light curtain and the machine control system work properly to stop the machine.
Failure to test properly could result in serious injury to personnel.
ST
AR
T
ST
OP
Содержание F3SL
Страница 2: ......