26
Operating Procedure
Section 3-2
3-2
Operating Procedure
3-2-1
Overall Procedure
The operating procedure for an ID Sensor Unit is shown in the following flow-
chart.
Note
1.
When using CX-Programmer V3.0 or later with the CJ1W-V600C12, “I” will
be displayed before addresses for inputs in the ladder diagram and “Q” will
be displayed before addresses for outputs for operation data. In the CX-
Programmer’s
I/O Table
Window, select
SIOU/C200H ASCII Unit (A)
and
then, from the
Enter SIOU Details
Window, set the
Address per Unit
to 2,
the
Input Words
to 3, and the
Output Words
to 7, and select the
Repeat IN/
OUT for each Address per Unit
option.
2.
When using CX-Programmer V2.0 or later with the CJ1W-V600C11, “I” will
be displayed in the ladder diagram before address for inputs and “Q” will
be displayed before addresses for outputs for operation data.
Set switch on front of Unit
Wire
Set unit number
Turn ON PLC power
Create I/O tables
Set words allocated in DM Area
Turn PLC power OFF and ON.
Set switch on front of Unit
Test communications
Change DIP switch on front of Unit
Turn ON PLC power
Ladder program operation
Turn OFF the communications test switch.
Set unit number switches on front of Unit.
Set communications mode.
Enable/disable verification when writing.
Set auto wait time
OR, turn ON Special I/O Unit Restart Bit.
Turn ON the communications test switch.
Place PLC in PROGRAM mode.
OR, turn ON Special I/O Unit Restart Bit.
Installation and settings
T
rail oper
ation
Oper
ation
Содержание CJ - 12-2004
Страница 2: ...SYSMAC CS CJ Series ID Sensor Units Operation Manual Revised December 2004...
Страница 3: ...iv...
Страница 11: ...xii...
Страница 55: ...36 Connections and Wiring Section 3 4...
Страница 69: ...50 I O Data Allocations Section 4 3...
Страница 91: ...72 Data Check Section 5 7...
Страница 141: ...122 Sample Programming Appendix B...
Страница 147: ...128 Revision History...