3.5 Controller Parameter Factory Default Settings
Figure 7. Factory Default Settings
3.6 Heat-Up/Cool-Down Transition Times
This chart illustrates the approximate time required to make a transition
from one temperature to another in minutes. Once reaching the desired
temperature, the probe well must be allowed to soak at the new temperature
for a period of time to reach full stabilization.*
Figure 8. Approximate Probe Well Heat-Up/Cool-Down Transition Times
* First determine the current plate temperatures and go to the corresponding
row. Now decide the new target plate temperature and go to the appropriate
column. Note that there are X’s along the diagonal to ensure the original and
target temperatures are the same.
3-5
LEVEL 1
LEVEL 2
LEVEL 3
TUNE
OFF
SP1.P
0
SP1.d
SSd1
BAND
A 53
hAnd
OFF
SP2.d
SSd2
int.t
A 3.3
PL.1
100
burn
Up.SC
der.t
A 11
PL.2
100
rEU.d
Ir.2d
DaC
A 4.0
sp2.A
nonE
rEU.L
In.2n
CyC.t
9.7
sp2.b
nonE
Span
13
OFSt
0
di Sp
0.1
Zero
-0.5
SP.Lk
OFF
hi.SC
500.0
ChEK
oFF
SP.rr
0
lo.SC
32.0
rEAd
VAr
SPrn
OFF
inPt
rtd
tECh
Ct A
SoAK
- -
unit
F
UEr
392
SEt.2
0.0
rSEt
nonE
bnd.2
N/A
CyC.2
N/A
CL1000 Series Operation
3
TO
Temperature C (F)
FROM
38 (100) 93 (200) 149 (300) 204 (400) 260 (500)
38 (100)
12
13
14
15
93 (200)
50
13
14
15
149 (300)
60
25
12
13
204 (400)
65
30
15
12
260 (500)
70
35
25
15
Te
mperature C (F)
Time (Minutes)
Содержание CL1000 Series
Страница 10: ...CL1000 Series Installation 2 2 4 Notes...