USG-400
Troubleshooting 8-6
ISSUE1
2.
Executing the probe check
With the grasping section open, press and hold the handswitch or footswitch
pedal for 3 seconds and then release it (see Figure 8.5)
The probe check starts.
The information window (Checking) is displayed.
When the check completes, the information window (Checking)
disappears and the probe check result is displayed.
Figure 8.5
To cancel the probe check before the execution, press the “Cancel button” on the
bottom left of the confirmation window (Probe Check).
The display returns from the confirmation window (Probe Check) to the
“All screen” or “Set screen”.The confirmation window (Probe Check) is displayed.
Figure 8.6
Содержание USG-400
Страница 1: ...ISSUE 1 2011 11 MAINTENANCE MANUAL USG 400...
Страница 2: ......
Страница 6: ......
Страница 10: ...USG 400 Product Outline 1 4 ISSUE1 4 System chart...
Страница 11: ...USG 400 ISSUE1 2 1 Specifications Chapter 2 Specifications 1 Specifications 2 2...
Страница 14: ......
Страница 34: ......
Страница 38: ......
Страница 43: ...USG 400 ISSUE1 5 5 Inspection Figure 5 3 Figure 5 4...
Страница 50: ...USG 400 Inspection 5 12 ISSUE1 Figure 5 12...
Страница 59: ...USG 400 ISSUE1 6 1 Safety check Chapter 6 Safety check 1 Check procedures 6 2 2 Check Card 6 6...
Страница 65: ...USG 400 ISSUE1 7 1 Block Diagram Chapter 7 Block Diagram 1 Block Diagram 7 2...
Страница 89: ......