
10-015490-01EN, Rev. 2, June 2020
Set Up and Operation
43
To load a sample into a
sample
cell
1.
Connect the external shaker plug to the External Shaker connector on the rear
panel (see Figure 3-13 on page 43).
Figure 3-13 External shaker plug connected
2.
Insert the sample carrier into the external shaker and gradually load a small
amount of material (enough to fill the gap created by the spacer) into the side A
cell assembly (see Figure 3-14 on page 44).
The material should be approximately 50 mg of coarsely ground (100–150 µm)
powder.
External shaker plug
Содержание BIX III
Страница 6: ...Table of Contents vi 10 015490 01EN Rev 2 June 2020...
Страница 8: ...10 015490 01EN Rev 2 June 2020 List of Abbreviations viii...
Страница 12: ...10 015490 01EN Rev 2 June 2020 Labels and Symbols 4...
Страница 28: ...10 015490 01EN Rev 2 June 2020 Introduction 20...
Страница 36: ...10 015490 01EN Rev 2 June 2020 Chapter 1 28...
Страница 64: ...10 015490 01EN Rev 2 June 2020 Chapter 4 56...
Страница 82: ...10 015490 01EN Rev 2 June 2020 Chapter 5 74...
Страница 84: ...10 015490 01EN Rev 2 June 2020 Appendix A 76...
Страница 100: ...10 015490 01EN Rev 2 June 2020 List of Tables 92...