1 1/4” Screw
2” Screws
1 1/4” Screw
2” Screws
2” Screw
2” Screw
41.
Attach all Single and Double Rafter
Brackets where rafters meet Top Wall Plates
inside of shed. Attach with
2 - 1 1/4” Screws
and
2 - 2” Screws
per
Single Rafter
Bracket
and
6 - 2” Screws
per
Double
Rafter Bracket
.
Have two helpers hold the Front and Rear
Walls at the top from the outside of shed to
keep the inside-to-inside measurement
between the Top Plates at 91”.
Hardware
Y30
- Single Rafter Brackets
x 6 total
Y31
- Double Rafter Brackets
x 4 total
S2
- 1 1/4” Screws
x 12 total
S3
- 2” Screws
x 36 total
42.
Locate one sheet of
Roof Plywood Large
. Position on right side of shed.
Recess plywood back approximately 1/8” from end of
Rafter
. Plywood will over-
hang outside Rafter by 3 3/4” and on opposite side, plywood will be centered on
5th rafter, being supported by
Rafter Nailing Cleat
.
Parts (Steps 42 - 43)
Roof Plywood Large
(5/8” x 48” x 72”)
x 1
Hardware (Steps 42 - 43)
S2
- 1 1/4” Screws
x 12 total
Overhang outside rafter by 3 3/4”.
Centered on 5th Rafter and
recessed 1/8” from Rafter end.
43.
With
Roof Plywood Large
correctly positioned on rafters, attach plywood to rafters
with
12 - 1 1/4” screws
. On 5th rafter, be sure to angle screw to hit the meat of the rafter.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25