background image

Making British gardens great

SHED BASE 

INSTRUCTIONS 

ISSUE: 0219

FIXING PACK CODE: 

SBPMFP

 

Tape 

Measure

We recommend using the following tools (

NOT SUPPLIED

):

Pozidrive 

Screwdriver

Drill & 2mm 

Drill Bit

Spirit Level

400mm

5’

3’

400mm

4’

3’

527.3mm

3’

6’

546mm

4’

6’

471.5mm

5’

7’

471.5mm

7’

7’

397.75mm

8’

6’

Start at the corners. 

Pre-drill and screw 

through the face of the one timber part into 

the end of the other.

 Use the section layouts 

below for guidance on positioning.

Repeat this process for the opposite corners

 

to form the overall outer frame. Ensure that all 

edges and faces of the timber parts are flush.

Measure where the central timber part(s) will 

be placed. Use the measurements from the 

section layout below for your chosen shed 

base. 

Mark, pre-drill and screw them into 

place.

1

2

3

Missing Something?

Call our aftersales team on

0333 777 7089

Need more information?

Call our technical team on

0333 321 3142

Visit our website for spare 
instructions and more 
information

www.forestgarden.co.uk

Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

5 x 

90mm

 Scr

ews

QTY

: 20

FIXING PACK CONTAINS:

SECTION LAYOUTS 

Identify your chosen shed base to follow the correct construction and 

measurements provided:

INSTRUCTIONS 

PLEASE KEEP PLASTIC BAGS AND 

SMALL PARTS AWAY FROM CHILDREN

REMINDER

Always  pre-drill       

before screwing.

SBP43M

SBP53M

SBP63M

SBP64M

SBP75M

SBP77M

SBP86M

It’s vital that you build your new shed base on 

level ground in your 

desired location.

Indicates the timber 
orientation during 
construction. This will apply to 
all of the corners for your base.

Reviews: