background image

Temporarily position Interior 
Vertical Door Stop to help 
align Interior Barrel Bolt.

Silver 
Barrel Bolt

66.

 Attach Interior 

Silver Barrel Bolt

 to inside of door as illustrated 

above. Use 

3/4” Silver Screws

 to secure. Refer to 

Step 67

 to allow for 

adequate clearance.

Hardware 

Y5

 

- Silver Barrel Bolt

 

x 1 total 

SS2

 

- 3/4” Silver Screws

 

x 6 total

67.

  Attach Interior Door Stops to door framing (Jambs 

and Header). Start with 

Vertical Door Stops

. Stops 

should overlap doorway by 1/2”.  Use 

4 - 1 1/4” Screws

 

to secure each piece.  Attach 

Horizontal Door Stop

 

next using 

3 - 1 1/4” Screws

.

Parts

 

Vertical Door Stops 

(1/2” x 2 1/2” x 72”) 

x 2 

Horizontal Door Stop 

(1/2” x 2 1/2” x 36”) 

x 1

Hardware 

S2

 

- 1 1/4” Screws

 

x 11 total

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 38

Содержание CB128-FJ-PLY

Страница 1: ...er Toll Free Line if you plan to deviate from our written instructions Safety Points and Other Considerations Our products are built for use based on proper installation on level ground and normal res...

Страница 2: ...on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual I...

Страница 3: ...of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 2 1 Cubic Yards of gravel require...

Страница 4: ...tion Rafter Assembly 2 3 4 x 4 1 2 x 84 Roof Ridge Boards 2 3 4 x 4 1 2 x 52 1 2 Roof Ridge Boards 18 1 1 2 x 3 1 2 x 56 1 2 Roof Rafters 4 1 2 x 4 1 2 x 68 1 4 Soffits 4 3 4 x 1 1 2 x 48 Rafter Naili...

Страница 5: ...4 Door Section 2 1 2 x 3 1 2 x 79 Vertical Door Trim 1 1 2 x 2 1 2 x 79 Front Wall Narrow Trim 1 1 2 x 1 1 4 x 32 Horizontal Door Trim 1 1 2 x 1 1 4 x 7 Horizontal Narrow Wall Trim 1 31 1 2 x 30 Top D...

Страница 6: ...s Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour P...

Страница 7: ...x 6 Floor Joist Frames Large 45 1 2 x 75 x 3 Floor Joist Frames Small 45 1 2 x 21 x 3 Hardware Steps 1 6 S1 2 1 2 Screws x 58 total A Floor Section Plywood Floor Large 3 Floor Joist Frames Large 3 Flo...

Страница 8: ...l be 136 1 2 wide x 96 deep 5 Complete all large and small frame attachments Screw each completed section together with 8 2 1 2 Screws Front of Shed You can find the Square Drive Bit for the screws in...

Страница 9: ...refully flip the floor over and place on your foundation Caution you will need 2 people to assist you Be careful when laying floor down not to bend or twist floor When in place level floor completely...

Страница 10: ...8 x 3 Plywood Floor Small 45 3 8 x 20 7 8 x 3 Hardware Steps 11 12 S2 1 1 4 Screws x 70 total approx Important Make sure floor is level before moving on to wall section Use a level to confirm and shim...

Страница 11: ...s to determine proper wall position to confirm B Wall Section Exploded view of all parts necessary to complete the Wall Section Identify all parts prior to starting Window Wall Panel 2 Front and Rear...

Страница 12: ...olid Wall Panel on top of plywood floor The Wall Panel bottom framing will sit flush with plywood Wall siding will overhang the floor The Rear Wall panels will sit flush at the end of the plywood floo...

Страница 13: ...om middle and top of stud to secure properly Hardware Steps 16 18 S1 2 1 2 Screws x 18 total Rear Wall S i d e W a l l 17 With the corner wall attachment complete position a second Side Wall panel in...

Страница 14: ...Complete all Side and Rear Wall attachments as per Steps 15 17 Pilot Hole first Pilot Hole first Pilot Hole first Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page...

Страница 15: ...Parts Window Walls 45 1 2 x 75 x 2 Hardware S1 2 1 2 Screws x 6 total Pilot Hole first 20 Position and attach Narrow Wall as per Steps 15 18 Parts Narrow Wall 12 x 73 x 1 Hardware S1 2 1 2 Screws x 3...

Страница 16: ...2 1 2 Screws per side Header is 3 1 2 wide at bottom and has a 1 2 thick x 3 wide strip of wood stapled to the top creating a notch or dado effect This notch needs to be positioned on the top facing...

Страница 17: ...ll framing with 3 2 Screws per plate Parts Steps 24 25 Side Wall Top Plates 4 Angle Cut End 2 Straight Cut 3 4 x 2 1 2 x 32 x 6 Front Rear Wall Top Plates Angle Cut Edge 3 4 x 2 1 2 x 65 3 4 x 4 Hardw...

Страница 18: ...Rear Top Plate attachments the same Male Female Gable Siding Overlap 26 Locate Triangular Gable Half Walls for both sides of the shed Align framing and wall siding lap together Screw center wall frami...

Страница 19: ...ttachment will be completed with an additional 6 Screws Screw from the bottom of Gable framing down into Top Wall Plate and Wall Framing Complete Gable positioning and attachment on the other side Hin...

Страница 20: ...f Ridge Boards the same Position metal Ridge Board Connector evenly on Ridge Boards Parts Ridge Boards Long 3 4 x 4 1 2 x 84 x 2 Ridge Boards Short 3 4 x 4 1 2 x 52 1 2 x 2 Hardware SS2 3 4 Screws x 1...

Страница 21: ...easure and position interior Rafters as illustrated below When positioned correctly attach Ridge Board to remaining Rafters with 2 2 Screws Rafter end 31 Attach end of a Soffit flush to ends of outsid...

Страница 22: ...Gable Notch Ridge Board Rafter 33 Slide Rafter Section up on gable framing until bottom of Ridge Board slips into gable notch Rafter should rest on gable framing Soffit Ridge Board 32 Flip Rafter Sect...

Страница 23: ...rds place 1 1 4 Screws into any of the remaining metal Ridge Board Connector holes Complete both sides Hardware S2 1 1 4 Screws x 20 total approx 37 With both Ridge Boards connected completely secure...

Страница 24: ...ws Pilot hole each Gusset end with 1 8 drill bit Parts Steps 39 40 Roof Gussets 3 4 x 3 1 2 x 72 x 3 Hardware Steps 39 40 S3 2 Screws x 12 total 38 Attach 2 Rafter Nailing Cleats on the middle Rafter...

Страница 25: ...36 total 42 Locate one sheet of Roof Plywood Large Position on right side of shed Recess plywood back approximately 1 8 from end of Rafter Plywood will over hang outside Rafter by 3 3 4 and on opposi...

Страница 26: ...t to first two panels near Ridge Board and attach with 12 1 1 4 screws Parts Step 45 Roof Plywood Large 5 8 x 48 x 72 x 1 Hardware Step 45 S2 1 1 4 Screws x 12 total 46 Locate second sheet of Roof Ply...

Страница 27: ...mportant Plywood roof panels must be covered with water proof roofing paper or equivalent material now Roofing paper and roofing material is not supplied in this kit Leaving plywood roof panels unprot...

Страница 28: ...Rear Wall Narrow Trim 2 Side Facia 4 Pentagon Facia Plate 2 Horizontal Gable Trim 4 Side Wall Narrow Trim 2 Bottom Skirting 10 Filler Trim 4 Wide Corner Trim 4 Corner Trim 4 Front Wall Narrow Trim 1...

Страница 29: ...Skirting Bevel 1 2 x 4 1 2 x 45 1 4 x 10 Hardware N1 1 1 2 Finishing Nails x 40 total 49 Attach Filler Trim to each corner side wall Align Filler Trim so it sits flush with the bottom of the last piec...

Страница 30: ...tight underneath Soffit 51 To trim out corners start with a Corner Trim align tight underneath Soffit and Rafter Align Wide Corner Trim with bottom of Corner Trim Corner Trim will cap the Wide Corner...

Страница 31: ...orizontal Gable Trims to both sides of shed 2 per side Position over gable and wall seam with thick end of Bevel downward Use 4 1 1 2 Finishing Nails to secure each piece Parts Horizontal Gable Trims...

Страница 32: ...inishing Nails x 16 total Align with bottom of Horizontal Gable Trim 55 Attach both Side Wall Narrow Trims where wall seams come together on sides Position trim equally on wall seam and flush with the...

Страница 33: ...Attach Side Facia to end of roof panel plywood and Nailing Strip Line Facia up to form a peak and attach to Nailing Strip plywood with 6 1 1 2 Finishing Nails per piece End of Facia should be aligned...

Страница 34: ...a Detail Plate 59 Attach Pentagon Facia Plates where Side Facias meet at the peak Secure with 4 1 1 2 Finishing Nails per piece Attach Facia Detail Plates to cover seams where Front and Rear Facia pie...

Страница 35: ...ront Wall Narrow Trim 60 Position Vertical Door Trim pieces flush with inside edge of Door opening and tight to Soffits on top Position Front Wall Narrow Trim evenly on seam where Narrow Wall and Wind...

Страница 36: ...64 Dutch Door Top 31 1 2 x 30 x 1 Dutch Door Bottom 31 1 2 x 42 x 1 Hardware Steps 62 64 Y1 Tee Hinges x 4 total SB1 3 4 Black Screws x 4 total SB2 2 Black Screws x 20 total Bottom Skirting Bottom Doo...

Страница 37: ...n to help you Attach hinges to trim with 2 Black Headed Screws provided 65 Attach Door Handle and Exterior Black Drop Latch to door Handle is positioned on top door Drop Latch on bottom door Attach Bl...

Страница 38: ...Bolt x 1 total SS2 3 4 Silver Screws x 6 total 67 Attach Interior Door Stops to door framing Jambs and Header Start with Vertical Door Stops Stops should overlap doorway by 1 2 Use 4 1 1 4 Screws to...

Страница 39: ...ched caulk the triangular gap between the Insert s outside flange and the siding Also put a bead of caulking horizontally at top of window where the flange and siding meet This additional caulking wil...

Страница 40: ...2 Screws per box Screw from inside of box into the center Window Wall stud Attach second screw 2 underneath first screw and once again into the wall stud Install Flower Box Kits underneath each window...

Страница 41: ...ps 3 On a flat surface flip Flower Box on it s rear face Evenly space Brackets and secure through Base Frame and into the Brackets with 2 1 1 4 screws per Bracket Position completed Flower Box beneath...

Страница 42: ...other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading statement or impression as to the posit...

Отзывы: