91” Across
40.
Complete remaining 2 Gussets
as per
Step 39.
39.
Roof Gussets
are positioned on mid rafters. Have two helpers push the
Front and Rear Walls at the top from the outside of shed until inside to inside
measurement between the Top Plates is 91”. Slide Gusset up on side of Rafters.
Gusset must be below top edge of Rafter. Use level to square Gusset and attach
to Rafters with
4 - 2” Screws
. Pilot hole each Gusset end with 1/8” drill bit.
Parts (Steps 39 - 40)
Roof Gussets
(3/4” x 3 1/2” x 72”)
x 3
Hardware (Steps 39 - 40)
S3
- 2” Screws
x 12 total
38.
Attach
2 - Rafter Nailing Cleats
on the middle
Rafter
on both sides of
shed. Cleat will sit 4 1/4” from end of
Rafter
and
Ridge Board.
Cleats aligned
flush with top of rafter and attached with
3 - 1 1/4” screws
per piece
.
Parts (Step 38)
Rafter Nailing Cleat
(3/4” x 1 1/2” x 48”)
x 4
Hardware (Step 38)
S2
- 1 1/4” Screws
x 12 total
4 1/4”
Cleats flush with
top of rafter.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 24