Outside Panel
Middle Panel
Outside Panel
43.
Position and attach Front Roof Panels as per
Steps 39-42.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 20
44.
Roof
Filler Shingles
are included to cover
roof seams. Starting at the bottom, slide the first
Long Shingle in until flush with other bottom
shingles.
45.
Screw first filler shingle down to rafters
using 1 - 2 1/2” screw per panel (2 in total).
Make sure to screw into both rafters.
Attach above
the exposure
46.
Slide in another filler shingle and attach as per
Step 45.
On your last row of shingles, attach
smaller filler shingle with 2 - 1 1/2” Shingle nails near the top, to be covered by Ridge Caps in
Step 56
. Inside the shed, position 2 Simpson Strong ties on plywood and outside rafter and secure
with 4 - 1 1/4”screws each. Complete for both Gables - there are 4 ties per Gable.
4 - 90 degree Simpson
Ties / Gable.
Exposure Line