66.
Attach Interior
Door Stops
to door framing
(Jambs and Header). Start with Vertical pieces first
(1/2” x 2 1/2” x 72”). Stops should overlap doorway
by 1/2”. Use 4 - 1 1/4” screws to secure each Stop.
Attach Horizontal Stop next (1/2” x 2 1/2” x 36”)
using 3 - 1 1/4” screws.
63.
Attach
Horizontal Door Trim
(1/2” x 1 1/4” x 32”) with 4 - 1 1/2” finishing
nails to cover Header.
top
door
trim
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 27
64.
Attach
Door Handle
and
Exterior Black Barrel
Bolt
to door. Handle is positioned on top door, Barrel
Bolt on bottom door. Attach Black Barrel Bolt as
illustrated above with 2” & 3/4” Black Screws. Note
how female part of Barrel Bolt is positioned higher than
male. Do a dry run first to position Barrel Bolt correctly.
Temporarily position Interior
Vertical Door Stop to help
align Interior Barrel Bolt.
2” Screws
3/4” Screw
Silver Barrel
Bolt
Important:
Drill pilot
holes with 1/8” drill bit
prior to securing with
screws to prevent
wood splitting. On 3/4”
screw, drill shallow
pilot hole only.
65.
Attach
Interior Silver Barrel Bolt
to
inside of door as illustrated above. Use
3/4” silver screws to secure. Refer to
Step 66
to allow for adequate clearance.
67.
Assemble
Flower Box
with
Assembly Instructions included. Position
completed Flower Box below bottom of
window trim and secure with 2 - 2”
screws per box. Screw from inside of
box into the center wall stud. Attach
second screw 2” underneath first screw
and once again into the wall stud. Install
Flower Box Kits underneath each
window.