![background image](http://html.mh-extra.com/html/olt/9x6-cabana-bevel/9x6-cabana-bevel_assembly-manual_732293012.webp)
21.
When all walls are attached
together, check alignment with the floor.
Bottom of wall frames should sit flush
with outside of floor framing, with siding
overhanging by approximately 1/2”.
Confirm 32” wide door opening at
bottom. When positioned correctly,
fasten bottom wall plates to floor using
4 - 2 1/2” screws per wall panel.
bottom plate
of wall.
20.
Attach
Door Header
(2” x
3 1/8”
x 35”) to vertical door jambs with 2 - 2 1/2” screws per
side. Header is 3” wide at bottom and has a 1/2” thick x 2 1/2” wide strip of wood stapled to the
top creating a step or dado effect. This step needs to be positioned on the top facing the front.
The step is necessary as the roof panel may hang up on the header and must sit flush on the
rafter tops when attached.
Screw from door header into door jambs with 4 - 2 1/2” screws
(2 per side). Pre-drill to prevent splitting!
22.
Position a
Side Top
Plate
(3/4” x 2 1/2” x 75”)
angle cut on end) on top
wall framing so they are
flush. Attach by screwing
down into top of wall
frame with 4 - 2” screws.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12
Step or dado
edge to front
and on top.
Caulking
Optional
- Caulking
seams will help prevent
moisture from entering
your shed.
Caulking
not included in kit.
Angle
screws into perimeter
Floor Joists.
32”
Pilot Hole
first.