27
. Position the
Front Top Plates
on top of Door Header and
front wall panel. There are 2 plates (72” and 19” long). Front top
plates are straight cut on the ends. Once again, the plate will be
flush with inside of top wall framing. Attach with
6 - 2” screws
(4 screws in long and 2 in short plate).
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19
26.
Attach the 4
Side Top Plates
. The
side top plates are angle cut down the
length. Once again, position top plate on
wall plate so it is flush with inside of wall
plate. Side plate should also be flush with
rear wall plate. Secure with:
4 - 2” screws per rear piece.
1 - 2” screw & 3 - 1 1/4” screws
per
front piece.
PreDrill!
4 - 2” Screws
1 - 2”
Screw
3 - 1 1/4” Screws
Flush
Parts (Steps 26)
Side Top Plates
(3/4” x 2 1/2” x 67”)
x 4
Hardware (Steps 26)
S3
- 2” Screws
x 10 total
Hardware (Steps 26)
S2
- 1 1/4” Screws
x 6 total
Parts (Steps 27)
Front Top Plates
(3/4” x 2 1/2” x 72” & 19”)
x 2
Hardware (Steps 27)
S3
- 2” Screws
x 6 total