Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 30
54.
Locate one
Small Plywood Roof Panel
and one Large Roof
Plywood Panel. Repeat
Steps 51 - 53
to complete 2nd half of roof but
alternate which size of panel is near ridge board as shown above.
Hardware (Step 54)
S2
- 1 1/4” Screws
x 20 total
55.
Repeat
Steps 51 - 54
to complete opposite side of roof with 4
remaining roof panels (2 large and 2 small).
Hardware (Step 55)
S2
- 1 1/4” Screws
x 40 total
Completed Roof Section
Small gap between roof panels