Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 42
76.
Position
Front Facia
- angle cut ends tight underneath roof shingles
and tight against Nailing Strips. Temporarily position
Side Facia
for a dry run
to help you correctly position Front Facia before attaching.
Attach Front Facia to Roof Plywood with
8 - 1 1/2” Finishing Nails
per
piece. A small gap may appear where Front Facias come together at peak.
This gap will be covered in
Step 79.
77
Attach
Side Facia
to rafter ends. There are 2 Facia pieces per side.
A small gap may appear between Facias, which will be covered in
Step
79
. Secure with
8 - 1 1/2” Finishing Nails
per piece.
Hardware (Steps 76)
N1
- 1 1/2” Finishing Nails
x 16 total
Small gap
may appear
Rear Facia
Side Facia
Hardware (Steps 77)
N1
- 1 1/2” Finishing Nails
x 32 total
Small gap
between
side facia