ALYAS E INVERTER
EN - 17
ENGLISH
2.7.4 - Electric connection
Before connecting the air conditioner, make sure that:
a. The power supply voltage and frequency values respect that specified on the appliance data
plate.
b. The power supply line has an effective earth connection and it is correctly dimensioned for
maximum absorption of the climate control unit.
c
. To select the minimum section of the power supply cable, refer to the table below.
Maximum absorbed
(A)
> 3 e ≤ 6
> 6 e ≤ 10
> 10 e ≤ 16
> 16 e ≤ 25
> 25 e ≤ 32
> 32 e ≤ 40
Nominal section
(mm²)
0,75
1
1,5
2,5
4
6
A suitable omnipolar disconnection device must be envisioned on the appliance mains
electric power supply, in compliance with the national installation rules.
It must be checked that the electric power supply has an effective earth and suitable
protections against overloads and/or short circuits.
The use of a ceramic fuse of the characteristics shown in the table is advised (or other
devices with the same functions).
The connection to the mains power supply must be made by the installation technician
(excluding mobile appliances, for which fixed installation by qualified personnel is
not required) in compliance with the regulations in force.
BEFORE MAKING THE ELECTRIC CONNECTION, MAKE SURE THAT THE UPSTREAM
ISOLATING SWITCH IS AT “0” (OFF) AND THE PROTECTIONS OF THE INDOOR AND
OUTDOOR UNITS ARE POSITIONED CORRECTLY.
2.7.5 - Operation test
The operation test must be carried out only after completing the following procedures:
- Electrical safety checks;
- Check for gas leakage;
- Check that the valves on the gas side and on the liquid side (high or low pressure) are completely open.
Carry out the operation test as described below:
The operation test must be carried out for at least 30 minutes.
a
. Connect the unit to the mains supply.
b
. Press the ON/OFF key to switch the unit on; press the MODE key to scroll between the functions below,
one at a time:
• COOL – Select the lowest possible temperature
• HEAT – Select the highest possible temperature
Leave each function active for 5 minutes.
During the operation test, carefully check that no one of the points of connection of
the coolant pipes shows any leakage.
Содержание ALYAS E INVERTER 9
Страница 2: ......
Страница 8: ...min 120mm min 150mm min 120mm min 2300mm 1 3 5 4 7 8 2 4 7 3 5 6 9 7 M L N 7 C B A...
Страница 9: ...10 12 11 13 90 14 16 15 D E C B A 6 5 5 A B C D E 17 F...
Страница 10: ...min 1500mm 18 19 21 20 20 20 22 22 23 24 23 24 22 23a 26 27 28 29 30 28 23b...
Страница 11: ...24 25 8m A B E G C D F F1 26 27 31 28 30 29 4 2 1 5 10 10a 6 4 11 3 3a 8 7 9...
Страница 12: ...32 33 click 34 35 38 39 a b 36 37...
Страница 224: ...EL 2 0 0 1 0 2 0 2 1...
Страница 225: ...ALYAS E INVERTER EL 3 0 3 1 OLIMPIASPLENDID 2 3 4 5 6 7 8 9 10 11 12 13 OLIMPIA SPLENDID 14 OFF 3...
Страница 226: ...EL 4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 R32 R32...
Страница 227: ...ALYAS E INVERTER EL 5 Global Warming Potential GWP 675 36 37 A2L 2 1 0 4 12 0 5 OLIMPIA SPLENDID 0 6...
Страница 229: ...ALYAS E INVERTER EL 7 1 4 a b c 3 d e OLIMPIA SPLENDID 3 2 2 1 A2L 4 m2 4 m2 OLIMPIA SPLENDID...
Страница 230: ...EL 8 2 2 a b c d e CO2 f g h...
Страница 231: ...ALYAS E INVERTER EL 9 i l 2 3...
Страница 234: ...EL 12 2 5 4 9 a A b C Teflon c 2 5 5 10 10 Pond Box 10 2 6 a 11 b 11 c 12 d 12 e f g h i l m 13 n A B C D E F...
Страница 237: ...ALYAS E INVERTER GR A B A B A B plaque A B A B A B kg kg kg 1 2 3 EL 15 2 6 6 2 1 kg 2 kg 3 kg 2 6 7...
Страница 240: ...EL 18 c 17 C COOL 2 2 2 7 6 3 3 1...
Страница 241: ...ALYAS E INVERTER EL 19 TV 3 1 1 24 25 a b c 3 1 2 1 5V AAA LR03 LR03X2 3 1 3 8 26...
Страница 249: ...ALYAS E INVERTER EL 27 4 0 OFF 4 1 4 1 1 4 1 2 41 43 44 45 a 35 b 37a 37b c d e 38 10 f g h 39 i 4 2 a b c a b c...
Страница 250: ...EL 28 4 2 1 4 3 1 2 3 4 4 4 1 led E x P x F x EH xx EL xx EC xx PH xx PL xx PC xx 10 2...
Страница 251: ...ALYAS E INVERTER EL 29 4 4 1 3 SILENCE SILENCE...
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...265706A...