Effective 11/2010
26
Although every
MOGS-100
unit is thoroughly tested and checked before it is
shipped from our facility, the following checks are necessary to ensure that none of
the internal components have been damaged in shipment. This check should take
less than five minutes to perform.
(Refer to ‘
Initial Inspection’
on Page 2 before
reading the instructions below)
Make a visual inspection of the interior and exterior of the machine. Ensure that all
parts are properly attached and that there is no obvious damage including external
manifold (if applicable).
Connect the unit to an electrical panel of
230 VAC
with a
30 A
circuit breaker.
Ensure that the touch screen is powered and a display is visible. Consult the
troubleshooting guide in this manual (
See Page 28
) for any problems encountered.
After entering a password and selecting a language, start the machine by pressing both
the
Operating Mode
(AUTOMATIC)
, and then the
ON/OFF
buttons.
Listen for the sound of the compressors and cooling fan to start running, if you do not
hear them within a few seconds, shut the machine down immediately by pressing the
ON/OFF
button and call
OGSI
for assistance.
Once the machine is running, press the
MAIN MENU
button then press
GAUGES
to
view the
GAUGE
screen. Both the regulated air and low oxygen pressure gauge needle
indicators should be operating within the highlighted green area. The Oxygen Purity
Gauge should steadily increase to above
90%
.
The oxygen storage tank pressure gauge should indicate a pressure increase after
approximately
15
minutes
.
If this does not occur, check to make sure that none of
the hose connections have come loose
.
Call
OGSI
Technical Service Department
at
(800) 414-6474
(toll free number in USA and Canada) or
(716) 564-5165
if no loose
connections are found and trouble persists
.
Set-up & Installation
Содержание MOGS - 100
Страница 2: ......
Страница 6: ......
Страница 50: ...Effective 11 2010 44 MOGS 100 Filling Manifold Design Installation Optional...
Страница 58: ......
Страница 59: ...Appendix...
Страница 60: ......
Страница 67: ...Effective 11 2010 VII Maintenance Log Date Part Reason for Maintenance Authorized Service Technician Signature...