INSTALLATION ITEMS
Before installing fi replace, make sure you
have the items listed below.
external regulator (supplied by installer, for
•
propane/LP units only)
piping (check local codes)
•
sealant (resistant to propane/LP gas)
•
equipment shutoff valve *
•
test gauge connection*
•
ground joint union
•
sediment trap
•
tee joint
•
pipe wrench
•
* An CSA design-certifi ed equipment shutoff
valve with 1/8” NPT tap is an acceptable al-
ternative to test gauge connection. Purchase
the optional CSA design-certifi ed equipment
shutoff valve from your dealer.
INSTALLATION
Continued
Note: When installing fi replace directly on
carpeting, tile or other combustible material,
other than wood fl ooring, the fi replace shall be
installed on a metal or wood panel extending
the full width and depth of the fi replace.
Use the dimensions shown for rough openings
to create the easiest installation (see
Built-In
Fireplace Installation
, page 11).
CHECK GAS TYPE
Use only the correct gas type (natural or
propane/LP) for your unit. If you do not know
your gas type, do not install heater. The heater
leaves the factory set for propane/LP gas. If
natural gas is desired, a qualifi ed installer can
perform the simple conversion to natural gas
by following the instructions on page 13.
WARNING: This appliance
is equipped for natural and
propane/LP. Gas type is indicated
on the rating plate. Field conversion
is not permitted other than between
natural or propane gases.
WARNING: Always have
hood in place before operating
fireplace. This prevents excessive
temperatures on fireplace surfaces.
WARNING: Failure to position
the parts in accordance with these
diagrams or failure to use only
parts specifically approved with
this fireplace may result in property
damage or personal injury.
Figure 4 - Removing and Replacing
Screen (Mantel Not Shown)
9
Tools Required:
• Phillips screwdriver • slotted screwdriver
• 5/16” hex wrench • scissors
1. Lift fi replace screen up and pull out to
remove (See Figure 4), Set screen aside
until installation has been complete.
2. Remove all packaging from inside of unit.
3. Remove bubble wrap from logs and discard.
4. Check installation of brick liners. Brick liners
are in 4 pieces: 2 sides, 1 back and 1 top.
FlREPLACE CLEARANCES
Minimum Clearances For Side Combustible
Material, Side WalI and Ceiling
A. Clearances from the side of the fi replace
cabinet to any combustible material and wall
should foIlow diagram in Figure 5.
Example: The face of a mantel, bookshelf
etc is made of combustible materiaI
and protrudes 3 1/2” from the wall. This
combustible materiaI must be 4” from the
side of the fi replace opening (see Figure 5).
B. Clearances from the top of the fi replace
opening to the ceiling should not be Iess
than 36”.
C. For mantel clearances, see Figure 8 on
page 13.
Содержание VFF23NLM
Страница 25: ...Replacement Parts FIREBOX Model VFF23NLM 25...