Operating Instruction and Documentation
UNI-LIFT 4000
- 3 -
Document D.06: Short Description for QMW 1.0
QMW 1.0 describes the procedures of installation a new lift and of maintenance of lifts during the lift
life cycle. The QMW 1.0 must be to applied for all lifts certificated by Daimler AG for the wheel
alignment in Daimler workshops.
Attention ! Please fill in the reports instructed below, please make a copy of each and send it
to the manufacturer or to your client in order that he will send the reports to the
manufacturer.
Æ
New Lift: Handing over and installation the lift in a Daimler workshop
1.
Arrange delivery and installation date with the customer of the lift.
2.
Check the delivery content for completeness and for possible damages
Note missing parts on the
Shipping Report P.03
, in case of missing parts put this report to
the others and send them back together. Note other irregularities on the
Installation and
Instruction Report P.04
.
3.
Assembly, Installation, Levelling of the lift
3.1 After installing the lift apply the basic check for level alignment with an external electronic
levelling device and note the results on the
Daimler Quality Report Q40.2/9.1
.
3.2 In case the wheel alignment equipment is installed apply the track level alignment check with
test sensors fixed to the vehicle as a cross check. Note the results on the
Quality Report
Q40.2/9.1
, In case the wheel alignment equipment is not installed continue with step 4.
Remove possible irregularities and note the irregularities and the repair steps on the
Quality
Report Q40.2/9.1
under remarks.
4.
Apply the security check according to the lift documentation and confirm it on the
Report P.04.
5.
Introduce the operating procedures to the operator(s) of the lift and hand over the lift to the
customer.
6.
Attach the sticker confirming the levelling to the lift
7. Fill
in
the
Installation and Instruction Report P.04
complete and readable. Note the
customers address and the serial number and the type of the lift. The responsible of the
customer has to confirm by sign the correctness of lift installation, obvious irregularities and
the instruction of the operators.
Reports to send to manufacturer
Installation and Instruction Report (P.04), DC Quality Report (Q40.2/9.1), in case of claims the
Shipping Report (P.03).
Æ
Working Lift: Testing and / or repairing the lift in a Daimler-Workshop
1.
Arrange delivery, maintenance, repair date
2.
On the opportunity of a periodical maintenance or a annual security check please check the
levelling of the lift either by a basic check or by a check with test sensors fixed to the vehicle.
Note the results on the
Quality Report Q40.2/9.1
.
3.
In case of faults on the levelling of the lift platforms apply the basic check with an electronic
levelling device after finishing the adjustment. The adjustment should be cross checked by the
track level alignment with test sensors fixed to the vehicle. Note the results on the
DC Quality
Report
Q40.2/9.1
.
4.
Note maintenance / repair work on the
Quality Report Q40.2/9.1
under remarks. The
responsible of the customer has to confirm by sign the correctness of the lift function or
obvious
irregularities.
5.
Attach the sticker confirming the levelling to the lift
Reports send to manufacturer
DC Quality Report (Q40.2/9.1)
Содержание UNI-LIFT 4000 MB
Страница 4: ...Operating Instruction and Documentation UNI LIFT 4000 4...
Страница 5: ...Operating Instruction and Documentation UNI LIFT 4000 5...
Страница 6: ...Operating Instruction and Documentation UNI LIFT 4000 6...
Страница 7: ...Operating Instruction and Documentation UNI LIFT 4000 7...
Страница 8: ...Operating Instruction and Documentation UNI LIFT 4000 8...
Страница 9: ...Operating Instruction and Documentation UNI LIFT 4000 9...
Страница 16: ...Operating Instruction and Documentation UNI LIFT 4000 16 2 5 Declaration of conformity...
Страница 18: ...Operating Instruction and Documentation UNI LIFT 4000 18 3 3 Datasheet...
Страница 19: ...Operating Instruction and Documentation UNI LIFT 4000 19...
Страница 22: ...Operating Instruction and Documentation UNI LIFT 4000 22...
Страница 23: ...Operating Instruction and Documentation UNI LIFT 4000 23 3 4 Hydraulic diagram drawing...
Страница 25: ...Operating Instruction and Documentation UNI LIFT 4000 25 3 5 Electrical diagram drawing...
Страница 26: ...Operating Instruction and Documentation UNI LIFT 4000 26...
Страница 27: ...Operating Instruction and Documentation UNI LIFT 4000 27...
Страница 28: ...Operating Instruction and Documentation UNI LIFT 4000 28...
Страница 29: ...Operating Instruction and Documentation UNI LIFT 4000 29...
Страница 30: ...Operating Instruction and Documentation UNI LIFT 4000 30...
Страница 31: ...Operating Instruction and Documentation UNI LIFT 4000 31...
Страница 32: ...Operating Instruction and Documentation UNI LIFT 4000 32...
Страница 33: ...Operating Instruction and Documentation UNI LIFT 4000 33...
Страница 34: ...Operating Instruction and Documentation UNI LIFT 4000 34...
Страница 35: ...Operating Instruction and Documentation UNI LIFT 4000 35...
Страница 36: ...Operating Instruction and Documentation UNI LIFT 4000 36...
Страница 37: ...Operating Instruction and Documentation UNI LIFT 4000 37 3 7 Electrical plug connection...