Operating Instruction and Documentation
UNI-LIFT 4000
- 50 -
8. Security check
The security check is necessary to guarantee the safety of the lifting during use. It has to be
performed in the following cases:
1. Before the initial operation, after the first installation
Use the form “First security check before initiation”
2. In regular intervals after the initial operation, at least annually.
Use the form “Regular security check at least annually”
3. Every time the construction of that particular lift has been changed.
Use the form “Extraordinary security check”
The first and the regular security check must be performed by a competent person. It is
recommended to service the lift at this occasion.
After the construction of the lift has been changed (changing the lifting height or
capacity for example) and after serious maintenance works (welding on carrying parts)
an extraordinary security check must be performed by an expert.
This manual contains form with a schedule for the security checks. Please us the adequate form
for the security checks. The form should remain in this manual after they have been filled out. In
the following there is a short description about special safety devices.
9. Installation and Initiation
9.1 Regulations for the installation
• The installation of the lift is performed by trained technicians of the manufacturer or one of its
distribution partners. If the operator can provide trained mechanics, he or she can install the
lift by him or herself. The installation has to be done according to this regulation.
• Installing the standard-automotive lift in a hazardous location or a washing bay is not
allowed.
• Before installation a sufficient foundation must be constructed. If the foundation is already
constructed then proof that the foundation conforms to the standard is required.
A level foundation for the installation is required. The foundations must be based in a frost
resistance depth, both outdoors and indoors in a position where the installer believes there is
no chance of frost. (see the foundation diagram drawing)
• An standard electrical supply 3PH, N+PE, 400V, 50 Hz must be provided. Observe the
electrical power supply of your country.
The supply line must be protected with a fuse 16 Ampere time lag . The minimum diameter
amounts to 2.5 mm².
• A compressed air supply with an inside width of 6 mm has to be provided at the operating
unit. The pressure must be between 6 - 10 bar (8 bar recommended)
• All cable ducts must be equipped with protective coverings to prevent accidents.
• After assembly of the lift, the protective grounding of the lift must be examined after
International Electronical Commission (IEC) guidelines (60364-6-61) before first start-up by
operators. Also an insulation resistance examination is recommended.
Содержание UNI-LIFT 4000 MB
Страница 4: ...Operating Instruction and Documentation UNI LIFT 4000 4...
Страница 5: ...Operating Instruction and Documentation UNI LIFT 4000 5...
Страница 6: ...Operating Instruction and Documentation UNI LIFT 4000 6...
Страница 7: ...Operating Instruction and Documentation UNI LIFT 4000 7...
Страница 8: ...Operating Instruction and Documentation UNI LIFT 4000 8...
Страница 9: ...Operating Instruction and Documentation UNI LIFT 4000 9...
Страница 16: ...Operating Instruction and Documentation UNI LIFT 4000 16 2 5 Declaration of conformity...
Страница 18: ...Operating Instruction and Documentation UNI LIFT 4000 18 3 3 Datasheet...
Страница 19: ...Operating Instruction and Documentation UNI LIFT 4000 19...
Страница 22: ...Operating Instruction and Documentation UNI LIFT 4000 22...
Страница 23: ...Operating Instruction and Documentation UNI LIFT 4000 23 3 4 Hydraulic diagram drawing...
Страница 25: ...Operating Instruction and Documentation UNI LIFT 4000 25 3 5 Electrical diagram drawing...
Страница 26: ...Operating Instruction and Documentation UNI LIFT 4000 26...
Страница 27: ...Operating Instruction and Documentation UNI LIFT 4000 27...
Страница 28: ...Operating Instruction and Documentation UNI LIFT 4000 28...
Страница 29: ...Operating Instruction and Documentation UNI LIFT 4000 29...
Страница 30: ...Operating Instruction and Documentation UNI LIFT 4000 30...
Страница 31: ...Operating Instruction and Documentation UNI LIFT 4000 31...
Страница 32: ...Operating Instruction and Documentation UNI LIFT 4000 32...
Страница 33: ...Operating Instruction and Documentation UNI LIFT 4000 33...
Страница 34: ...Operating Instruction and Documentation UNI LIFT 4000 34...
Страница 35: ...Operating Instruction and Documentation UNI LIFT 4000 35...
Страница 36: ...Operating Instruction and Documentation UNI LIFT 4000 36...
Страница 37: ...Operating Instruction and Documentation UNI LIFT 4000 37 3 7 Electrical plug connection...