
Service Manual
ALS/XLS 20x/256/272
02/2019 | 01
45
Plugging in the power lead
Ensure that the power switch [31A] is set to "O" (off).
Using the power supply cable provided, connect the
machine to a mains supply socket.
(ALS/XLS 20x with splash guard) The power supply
cable is connected by installing the splash guard.
mit Spritzwasserschutz: Das Netzanschlusskabel wird
durch aufsetzen der Abdeckhutze angesteckt.
Before installing the splash guard [32A], ensure
that…
– the machine side power switch [31A] is switched on
(position „I“).
– the power switch at the splash guard [32B] is
switched off (switch doesn´t light).
[31] Power lead (B) plugged in (ALS/XLS 20x).
[32] Machine with splash guard.
B
A
A
B
Содержание ALS/XLS 204
Страница 2: ......
Страница 8: ...Service Manual ALS 20x 256 272 05 2019 8 Contents ...
Страница 110: ...Service Manual ALS XLS 20x 256 272 02 2019 02 110 ...
Страница 258: ...Service Manual ALS XLS 20x 256 272 02 2019 03 258 Repair 199 Removing the fan C A B C D ...
Страница 309: ......
Страница 310: ......
Страница 311: ......
Страница 312: ...Novexx Solutions GmbH Ohmstraße 3 85386 Eching Germany 49 8165 925 0 www novexx com ...