- 6 -
REV-120
NOVATEK-ELECTRO
ATTENTION! Not to break or rotate the regulators to excessive extent, please do not use excessive
force when performing installation operations.
3.2.1.1.
The product operation mode adjustment
List of the REV-120 operation modes is given in table 3.
Find the desired mode of the product operation according to Table 3 and set the regulator for the operation
mode setting
W
to the required position (Fig.1 it.5).
Table 3
– Product operation modes
Name and W knob
position
Description
On-delay
After energizing, the set delay time
t
(
Т
regulator) occurs. During the delay time
the indicator ON of the load relay (Fig.1
it.8) periodically flashes.
At the end of the delay time the load
relay contacts
NO
and
C
are closed,
the indicator ON of the load relay is on
and the product goes into standby
mode until power-off.
Time delay when
energizing
After energizing, the load relay contacts
NO
and
C
are closed, the indicator ON
of the load relay (Fig.1 it.8) is on and
the set delay time
t
(
Т
regulator) occurs.
During the delay time the indicator ON
of the load relay periodically is off.
At the end of the delay time the load
relay contacts are opened, the indicator
ON of the load relay is off and the
product goes into standby mode until
power-off.
Periodic with on-delay
After energizing, the set delay time
t
(
Т
regulator) occurs. During the
delay time the indicator ON of the
load relay (Fig.1 it.8) periodically
flashes.
At the end of the delay time the load
relay contacts
NO
and
C
are closed
for the set time
t
and the indicator
ON of the load relay is on. During the
delay time the indicator ON of the
load relay periodically is off.
At the end of the delay time the load
relay contacts are opened, and the product starts fulfillment of algorithm from the
beginning.
Periodic with time delay
when energizing
After energizing, the load relay contacts
NO
and
C
are closed, the indicator
ONof the load relay (Fig.1 it.8) is on and
the set delay time
t
(
Т
regulator) occurs.
During the delay time the indicator ON
of the load relay (Fig.1 it.8) periodically
is off.
At the end of the delay time the load
relay contacts
NO
and
C
are open for
the set time
t
and the indicator ON of
the load relay is off. During the delay
time the indicator ON of the load relay periodically flashes.
At the end of the delay time the product starts fulfillment of algorithm from the
beginning.