
42
WLAN Cable Access Point 6220 NTPM99CA 01 Rel 1.0 Issue 3 Dec 2004
3.
Using the built-in trim gauge, verify the center conductor, trim
length(15/16 inch: 24mm) and remove the dielectric to a depth of 1 1/4
inch(32mm) from the end of the outer conductor.
Figure 3-11
Constructing Trunk and Distribution Coaxial Cable
4.
After all dielectric and pre-coats have been removed from the center
conductor, re-check the center conductor length and trim accordingly.
Figure 3-12
Shading the tip of the center conductor
5.
Make a cut halfway though and rotate the cutters 90° and complete the
cut.
6.
Slide the heat shrink tubing over the cable.
7.
Remove the outer jacket to a length of ½” (12.7mm).
8.
Install the back nut into the cable.
9.
Remove and clean flooding material.
10.
Install the main nut onto the cable, as a final check on both coring depth
and center conductor length. The center conductor will protrude 1/16”
to 1/8” past the end of the main nut.
11.
Ensure that the cable is fully inserted into the connector so that the
jacket butts up against the outer conductor seizing mechanism.
Содержание 6220
Страница 3: ...3 Publication history December 2005 Issue 1 Issued for WLAN Cable Access Point 6220 APU CSU ...
Страница 12: ......
Страница 18: ...18 WLAN Cable Access Point 6220 NTPM99CA 01 Rel 1 0 Issue 3 Dec 2004 Figure 1 6 Inner Panel APU ...
Страница 36: ...37 WLAN Cable Access Point 6220 NTPM99CA 01 Rel 1 0 Issue 3 Dec 2004 Figure 3 4 NTA 2412 Antenna Assembly ...
Страница 51: ...52 WLAN Cable Access Point 6220 NTPM99CA 01 Rel 1 0 Issue 3 Dec 2004 Figure 3 26 LED Visual Checking Procedure ...
Страница 119: ...120 WLAN Cable Access Point 6220 CSU NTPM99CA Rel 2 0 Issue 5 Dec 2005 802 11g 802 11b ...