Nortek AB 175 Скачать руководство пользователя страница 14

Form

 

I-A C (2-17),

 

Page

 

14

The burner controls are mounted in the burner control compartment which is an integral 

part of the air curtain cabinet and is accessible by opening a hinged lid on the on the 

right hand side of the air curtain unit, reference 

FIGURES 8 & 9

 shown below.

FIGURE 8:

 

Remove two lid retaining screws 

(indicated in circles shown) located on the right 

hand side on the top of the air curtain cabinet.

FIGURE 9:

 

The lid assembly 

will now swing down for access.

Once open, the following items are now accessible; gas safety valve, ignition controller, 

air  pressure  switch,  flame  probe,  ignition  electrode,  red  &  amber  neon  lamps  and 

associated wiring. (Reference wiring diagram for locations).

• 

Check clearances from combustibles per 

Section 4.2

.

• 

Verify unit clearances per 

Section 4.0

.

• 

Verify support structure holding unit can support the load.

• 

Verify unit is positioned away from exposure to water spray, rain and 

dripping water.

• 

Check venting supports and clearances per 

Section 6.2

.

• 

Check piping for leaks and proper gas line pressure. Bleed gas lines of 

trapped air.

• 

Check electrical wiring, be sure correct wire gauges have been used. A 

service disconnect switch should be in place. Verify fuses used are correct 

for load use.

The entire gas service installation, including the meter must be inspected, tested and 

purged in accordance with the current National Fuel Gas and local codes. 

All gas piping was factory checked prior to shipping, however during transit 

and installation, connections may have loosened. Check all joints for leakage 

and correct if necessary.

WARNING

All  components  of  a  gas  system  must  be  leak  tested  prior  to 

placing  equipment  in  service.  NEVER  TEST  WITH  AN  OPEN 

FLAME. Failure to comply could result in personal injury, property 

damage or death.

7.3 Burner Controls

8.0 Pre Startup Check, 

Adjustment, 

Startup & 

Shutdown

8.1 Pre Startup 

Check

8.2 Gas Connection 

Check

8.3 Gas Piping 

Check

Содержание AB 175

Страница 1: ...DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Leave the building immediately Immediately call your gas supplier from a...

Страница 2: ...l result in severe personal injury or death and or property damage 2 WARNING Failure to comply could result in severe personal injury or death and or property damage 3 CAUTION Failure to comply could...

Страница 3: ...ion to the warnings If you do not have knowledge of local requirements check with the local agencies who might have requirements concerning the installation Become familiar with the requirements of yo...

Страница 4: ...on 4 0 Dimensions Clearances Features Check the supporting structure to be used to verify that it has sufficient load carrying capacity to support the weight of the air curtain assembly The air curtai...

Страница 5: ...a surface or object that is necessary to ensure that a surface temperature of 90 F above the surrounding ambient temperature is not exceeded Minimum clearances are also listed on the heater rating pl...

Страница 6: ...be extend slightly past the ends of the air curtains units to aid in fastening WARNING Mounting of Multiple Air Curtains may require larger support channels to insure proper support of heavier loads 5...

Страница 7: ...lts at each end of the unit total of four as shown below Hex Head Bolts Button Head Socket Cap Screws Loosen the two button head socket cap screws that lock the louvers in position Note two pair on Mo...

Страница 8: ...e regulator external to the unit Capacity of Piping Cubic Feet per Hour based on 0 3 i w c Pressure Drop Specific Gravity for Natural Gas 0 6 Natural Gas 1000 BTU Cubic Ft Specific Gravity for Propane...

Страница 9: ...s in operation For Natural Gas The unit is set at the factory to a inlet supply pressure of 7 0 inches water column Inlet supply pressure to the valve for natural gas must be a minimum of 5 inches wat...

Страница 10: ...e OR single wall 26 gauge or heavier galvanized or material of equivalent durability and corrosion resistance vent pipe is required between the air curtain combustion exhaust and the vent terminal sec...

Страница 11: ...ced air inlet within 10 ft 3 1M 3 ft 0 9M above Combustion air inlet of another appliance 6 ft 1 8M Door window or gravity air inlet any building opening 4 ft 1 2M horizontally 4 ft 1 2M below 1 ft 30...

Страница 12: ...for __ Vent Pipe 90 Elbow 45 Elbow inch mm feet M feet M feet M AB 175 6 152 4 30 9 1 8 2 4 4 1 2 AB 225 6 152 4 30 9 1 8 2 4 4 1 2 Any length of single wall pipe exposed to cold air or run through a...

Страница 13: ...TERMINAL BLOCK CONTROL BOX L1 L2 N 1 2 3 4 5 TERMINAL BLOCK UNIT 1 2 3 4 5 HI MED L2 E OPTIONAL FACTORY WIRING FACTORY WIRING FIELD WIRING A TEMPERATURE RATING OF AT LEAST 105 DEGREES C MUST BE REPLAC...

Страница 14: ...nit is positioned away from exposure to water spray rain and dripping water Check venting supports and clearances per Section 6 2 Check piping for leaks and proper gas line pressure Bleed gas lines of...

Страница 15: ...e control panel cool heat selector switch to the heat position and wait for the burner to light 5 Observe the manometer reading located at the burner pressure test point 6 If an adjustment is necessar...

Страница 16: ...re resetting This occurs when ever the unit has been on a prolonged stand by period This unit is fitted with an automatic spark ignition When proper airflow for combustion is proven by the air proving...

Страница 17: ...2 Operation of vacuum switch 3 Replace fan Does the fan run NO Check 1 Vacuum switch tube 2 Air inlet vent for obstructions 3 Operation of vacuum switch 4 Replace fan Does the vacuum switch pull in C...

Страница 18: ...ntrol panel manual on off switch position 2 Fan circuit breaker s 3 Fan contactor and associated wiring YES NO Single fan unit off Check 1 Motor thermal trip may run when cool test motor 2 Motor wirin...

Страница 19: ...ch AB175 P N 205442 AB225 P N 204328 Gas Valve Natural Gas P N 270378 Manifold P N 1001152 Burner P N 1001153 Orifice Natural Gas AB175 P N 1001156 AB225 P N 1001155 Propane Conversion Kits Conversion...

Страница 20: ...urtain should only be serviced by a qualified technician It is recommended that this unit be inspected serviced once a year If this unit is located in a exceptionally dusty area service should be perf...

Страница 21: ...Form I A C 2 17 Page 21 NOTES...

Страница 22: ...nition Controller 19 Ignition Electrode with HT lead 19 Installation Codes 23 INSTALLATION RECORD 23 J Joints and Sealing 12 L Lighting Sequence 16 M Manifold 19 Massachusetts Requirements 3 Multiple...

Страница 23: ..._ ________________________________________________________ ________________________________________________________ Phone _________________________________ Model ________________ Serial No ___________...

Страница 24: ...rations subject to change without notice or without incurring obligations Nortek Global HVAC LLC 2017 All rights reserved All marks are property of their respective organizations O Fallon MO I Printed...

Отзывы: