6.2 

Venting

WARNING

The vent must be installed in accordance with national and local 

regulations. Failure to provide proper venting could result in 

death, serious injury and / or property damage. This unit must be 

installed with a vent to the outside of the building. Safe operation 

of  any  power-vented,  gas-fired  equipment  requires  a  properly 

operating vent system, correct provision for combustion air and 

regular maintenance and inspection.

Venting must be in accordance with the National Fuel Gas Code Z223.1 

or CSA B149.1 and b149.2, Installation Code for Gas Burning Appliances 

and Equipment and all local codes. Local requirements supersede national 

requirements. Combustion air for this heater only provided from surrounding 

ambient air. Flue products must always be vented to the outdoors.

Installation should be done by a qualified agency in accordance with these 

instructions. The  qualified  agency  installing  the  vent  or  vent/combustion  air 

system is responsible for the installation.
The venting systems illustrated in this manual are the only ones approved for 

these Air Curtain units. 

All pipe is field supplied. Requirements for vent pipe(s) as follows:

• 

Vent pipe approved for Category III appliance OR single wall, 26-gauge or heavier 

galvanized (or material of equivalent durability and corrosion resistance) vent 

pipe is required between the air curtain combustion exhaust and the vent terminal 

section.

• 

Double-wall (Type B) vent pipe is required for the vent terminal section. The length 

of pipe that extends through roof or wall.

A fixed flue must be installed on all air curtains. The fan is fitted with a 5-1/8” (130 mm) 

diameter female outlet.

The flue pipe needs to be supported every 6’-0” (1.8 M) and terminated externally with 

a 6”dia (152 mm) CC1 vent cap (P/N 111850).

The flue pipe may be installed vertically or horizontally, refer to 

FIGURES 6, 7A & 7B 

.

Ventilation should meet a minimum of 0.5 air changes per hour using appropriately 

sized fans interlocked with the unit.

In applications where air changes are less than 0.5 per hour, additional mechanical or 

natural ventilation is required.

WARNING

All vent terminals must be positioned or located away from fresh 

air intakes, doors and windows to preclude combustion products 

from entering occupied space. Failure to comply could result in 

severe personal injury or death / or property damage.

WARNING

Units  installed  in  multiples  require  individual  vent  pipe  runs 

and vent caps. Manifolding of vent runs is not permitted due to 

possible recirculation of combustion products into the building 

and back pressure effects on the combustion air switch.

Vent Pipe

6.0 Mechanical 

(cont’d)

Содержание AB 175

Страница 1: ...DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Leave the building immediately Immediately call your gas supplier from a...

Страница 2: ...l result in severe personal injury or death and or property damage 2 WARNING Failure to comply could result in severe personal injury or death and or property damage 3 CAUTION Failure to comply could...

Страница 3: ...ion to the warnings If you do not have knowledge of local requirements check with the local agencies who might have requirements concerning the installation Become familiar with the requirements of yo...

Страница 4: ...on 4 0 Dimensions Clearances Features Check the supporting structure to be used to verify that it has sufficient load carrying capacity to support the weight of the air curtain assembly The air curtai...

Страница 5: ...a surface or object that is necessary to ensure that a surface temperature of 90 F above the surrounding ambient temperature is not exceeded Minimum clearances are also listed on the heater rating pl...

Страница 6: ...be extend slightly past the ends of the air curtains units to aid in fastening WARNING Mounting of Multiple Air Curtains may require larger support channels to insure proper support of heavier loads 5...

Страница 7: ...lts at each end of the unit total of four as shown below Hex Head Bolts Button Head Socket Cap Screws Loosen the two button head socket cap screws that lock the louvers in position Note two pair on Mo...

Страница 8: ...e regulator external to the unit Capacity of Piping Cubic Feet per Hour based on 0 3 i w c Pressure Drop Specific Gravity for Natural Gas 0 6 Natural Gas 1000 BTU Cubic Ft Specific Gravity for Propane...

Страница 9: ...s in operation For Natural Gas The unit is set at the factory to a inlet supply pressure of 7 0 inches water column Inlet supply pressure to the valve for natural gas must be a minimum of 5 inches wat...

Страница 10: ...e OR single wall 26 gauge or heavier galvanized or material of equivalent durability and corrosion resistance vent pipe is required between the air curtain combustion exhaust and the vent terminal sec...

Страница 11: ...ced air inlet within 10 ft 3 1M 3 ft 0 9M above Combustion air inlet of another appliance 6 ft 1 8M Door window or gravity air inlet any building opening 4 ft 1 2M horizontally 4 ft 1 2M below 1 ft 30...

Страница 12: ...for __ Vent Pipe 90 Elbow 45 Elbow inch mm feet M feet M feet M AB 175 6 152 4 30 9 1 8 2 4 4 1 2 AB 225 6 152 4 30 9 1 8 2 4 4 1 2 Any length of single wall pipe exposed to cold air or run through a...

Страница 13: ...TERMINAL BLOCK CONTROL BOX L1 L2 N 1 2 3 4 5 TERMINAL BLOCK UNIT 1 2 3 4 5 HI MED L2 E OPTIONAL FACTORY WIRING FACTORY WIRING FIELD WIRING A TEMPERATURE RATING OF AT LEAST 105 DEGREES C MUST BE REPLAC...

Страница 14: ...nit is positioned away from exposure to water spray rain and dripping water Check venting supports and clearances per Section 6 2 Check piping for leaks and proper gas line pressure Bleed gas lines of...

Страница 15: ...e control panel cool heat selector switch to the heat position and wait for the burner to light 5 Observe the manometer reading located at the burner pressure test point 6 If an adjustment is necessar...

Страница 16: ...re resetting This occurs when ever the unit has been on a prolonged stand by period This unit is fitted with an automatic spark ignition When proper airflow for combustion is proven by the air proving...

Страница 17: ...2 Operation of vacuum switch 3 Replace fan Does the fan run NO Check 1 Vacuum switch tube 2 Air inlet vent for obstructions 3 Operation of vacuum switch 4 Replace fan Does the vacuum switch pull in C...

Страница 18: ...ntrol panel manual on off switch position 2 Fan circuit breaker s 3 Fan contactor and associated wiring YES NO Single fan unit off Check 1 Motor thermal trip may run when cool test motor 2 Motor wirin...

Страница 19: ...ch AB175 P N 205442 AB225 P N 204328 Gas Valve Natural Gas P N 270378 Manifold P N 1001152 Burner P N 1001153 Orifice Natural Gas AB175 P N 1001156 AB225 P N 1001155 Propane Conversion Kits Conversion...

Страница 20: ...urtain should only be serviced by a qualified technician It is recommended that this unit be inspected serviced once a year If this unit is located in a exceptionally dusty area service should be perf...

Страница 21: ...Form I A C 2 17 Page 21 NOTES...

Страница 22: ...nition Controller 19 Ignition Electrode with HT lead 19 Installation Codes 23 INSTALLATION RECORD 23 J Joints and Sealing 12 L Lighting Sequence 16 M Manifold 19 Massachusetts Requirements 3 Multiple...

Страница 23: ..._ ________________________________________________________ ________________________________________________________ Phone _________________________________ Model ________________ Serial No ___________...

Страница 24: ...rations subject to change without notice or without incurring obligations Nortek Global HVAC LLC 2017 All rights reserved All marks are property of their respective organizations O Fallon MO I Printed...

Отзывы: