17
Installation
Nortec GS
2583703_EN_1608
5.2.2 Typical Installation – Full-Size Units
Figure 6:
1, 2
3
4
14
2, 5
10
11
12
6
7
8
9
13
7
15
16
17
18
19
20
21
22
23
Installation Overview – Full-Size Units (GS 150 Shown)
1 Humidistat, On/Off (used for humidity control)
2 Humidity sensor or modulating humidistat (used for control
of the space in the return duct, high limit in the supply duct)
3 Duct, return air
4 Duct, supply air
5 Humidistat, On/Off, high limit (external security loop)
6 Drain line, condensate (with trap)
7 Funnel, air gap (with optional trap)
8 Supply line, gas
9 Manual gas shutoff valve
10 Fitting, union
11 Trap, sediment
12 Filter, water (optional, but recommended)
13 Valve, water shutoff
14 Supply line, water
15 Fitting, union
16 Switch, disconnect, electrical fused (dedicated)
17 Drain line
18 Drain line, exhaust condensate (CS/NX model only)
19 Steam line
20 Vent, air intake (connected to exterior – optional)
21 Vent, exhaust vent (connected to exterior)
22 Distributor, steam
23 Switch, air proving (external security loop)
Содержание GS
Страница 3: ...INSTALLATION MANUAL Gas fired Steam Humidifier Nortec GS 2583703_EN_1608 ...
Страница 12: ...6 For Your Safety 2583703_EN_1608 Nortec GS This page intentionally left blank ...
Страница 14: ...8 Receiving and Storage 2583703_EN_1608 Nortec GS This page intentionally left blank ...
Страница 20: ...14 Product Overview 2583703_EN_1608 Nortec GS This page intentionally left blank ...
Страница 72: ...66 2583703_EN_1608 Nortec GS This page intentionally left blank ...
Страница 78: ...72 Product Specifications 2583703_EN_1608 Nortec GS This page intentionally left blank ...
Страница 82: ...iv Appendix A 2583703_EN_1608 Nortec GS This page intentionally left blank ...