Oil Gun - Honeywell R7184 or Beckett 7505 
Controls Only - M5S Series.

Burner does not start with a call for heat

•  Check the electrical supply to furnace.
•  Verify the furnace door switch is in the 

ON

 position.

• Check for line voltage (115 VAC) at the oil primary 

control.

•  Check indicator LED with burner off, no call for heat (no 

fl ame). See Table 9 (page 28).

-  If green LED indicator is on, the cad cell is seeing 

stray light or the cad cell of controller is defective.

-  If green LED indicator is off, go immediately to step 

5.

-  If LED indicator is fl ashing (red or green on Beckett 

7505 control), refer to the next step 1 below - Reset 
primary control.

• Jumper 

T

 to 

T

 terminals on primary control.

- If burner starts, check thermostat or limit wiring 

connections.

- If burner does not start, turn off power. Check all 

wiring connections.

-  If burner does not start, replace primary control.

Burner starts & then locks out on safety
with Honeywell R7184 LED indicator fl ashing
½ second on, ½ second off. For Beckett 7505 
control, the red LED will fl ash

1.  Reset primary control: To reset the control from (soft) 

lockout, the button needs only to be pressed and 
released. If the R7184 control is in restricted mode, 
press and hold the button for 45 seconds - until the 
LED fl ashes once. If the 7505 control is in restricted 
mode, press and hold the button in for 15 seconds until 
the red  turns off and the yellow LED turns on.

NOTE:

 Restricted Lockout: If the control locks out three 

times in a row without a complete heat cycle between 
attempts, the lockout becomes a restricted (hard) lockout.

2. If the LED indicator stops fl ashing and the ignition 

remains off, the primary control could be defective. If 
line voltage is present at the igniter terminals, and there 
is no ignition, the igniter is likely defective and needs 
to be replaced.

3.  If the  stops fl ashing, burner turns on, but the control 

locks out again, check the cad cell. If the cad cell is 
operational, replace the primary control.

4. If the LED continues to fl ash at the interval listed 

above, verify that the control is not in restricted mode. 
If in restricted mode, reset it. If not in restricted mode, 
replace the control.

5.  If the (LED indicator for R7184 control; green LED for 

7505 control) stays off while the fl ame is on, check the 
cad cell sighting for view of the fl ame.

6.  If the burner locks out, check the cad cell resistance 

(See Table 8).

7.  If the burner stays running, the system is operational.
8.  If the (LED indicator for R7184 control; green LED for 

7505 control) is off, check the cad cell assembly after 
disconnecting the line voltage.

Burner will not start and the LED indicator
is fl ashing at 2 seconds on, 2 seconds off
for R7184 (or green LED is fl ashing for 7505)

•  Hold the reset button down for 1 - 2 seconds. If LED 

indicator continues to fl ash, wait for 60 - 70 seconds. If 
it still continues to fl ash, replace the primary control.

• 

Honeywell R7184 control

: To check cad cell resistance, 

press and release the button during the run mode, with 
the igniter off. The LED will fl ash to indicate the cad cell 
resistance. For proper burner operation, it is important 
that the cad cell resistance is under 1600 Ohms. For 
cad cell resistance, see Table 8.

• 

Beckett 7505 control

: To check cad cell resistance, 

unplug the cad cell leads (yellow wires) from the control. 
Measure the resistance with a meter in the conventional 
way (when a fl ame is present). For proper burner 
operation, it is important that the cad cell resistance is 
under 1,600 Ohms.

Table 8. Cad Cell Resistance when 

sensing fl ame

LED Flashes (Ohms)

Cad Cell Resistance

1

0-400

2

400-800

3

800-1600

4

>1600

Содержание M1B 066

Страница 1: ...hbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department WARNING RISQUE D INCENDIE OU D EXPLOSION Le non respect des avertissements de s curit...

Страница 2: ...pling 20 STARTUP ADJUSTMENTS 21 Operating Instructions Direct Ignition M1M 22 How to Shut Off Gas Direct Ignition 22 Operating Instructions Oil Gun M5S 22 Operating Instructions Gas Gun M1B 22 How to...

Страница 3: ...the current revision of the National Fuel Gas Code NFPA54 ANSIZ223 1 ortheNaturalGasandPropane Installation Code CAN CGA B149 1 CE g n rateur d air chaud doit tre install conform ment aux instructions...

Страница 4: ...equipment Behard wired batterypoweredorboth ShallcomplywithNFPA720 2005Edition c A product approved vent terminal must be used and if applicable a product approved air intake must be used Installation...

Страница 5: ...he overall size of the furnace and the installation clearances listed in Table 1 and in Figure 4 page 6 Alcove installations minimum 18 clearance at front of furnace shall be provided for future servi...

Страница 6: ...e 0 Side Clearance to Furnace Cabinet Provide min 235 sq in 1516 cm open free area in front or side wall 2 or In closet door located at top center or bottom CLOSET DOOR 6 152 mm Top Clearance Provide...

Страница 7: ...n the floor or ceiling registers serving the return air duct system must be at least 235 in2 At least one register should be located where it is not likely to be covered by carpeting boxes and other o...

Страница 8: ...ellineholesmustbecarefullylocated to avoid misalignment of the furnace and vent piping To locate standard ducts see Figure 6 page 9 For round ducts see Figure 7 1 Measure 10 from the rear wall or alco...

Страница 9: ...es X FLOOR OPENING FLOOR CAVITY SUPPLY AIR DUCT Figure 9 Floor Cavity Alternate Attachment Method The standard duct connector is designed for use on ducts 12 in width However if there is insufficient...

Страница 10: ...urn air distributionsystemasshowninFigures14 15 page11 1 Remove furnace outer door s and bottom fuel line knockout 2 Placefurnaceontoductconnectorandcenterwithfloor opening 3 Slideontomountingplate Bo...

Страница 11: ...in the minimum and maximum range of the Roof Jack listed in Table 4 Application Notes FAW FAWT SAW and SAWT Series Roof Jacks with a 5 diameter inner vent pipe may be used with all models of M1 Series...

Страница 12: ...ve along the center line of furnace and floor opening See Figure 19 2 Cut ceiling and roof holes Ceiling 8 3 4 222 mm diameter Roof 9 3 8 238 mm diameter Installing The Roof Jack 1 Apply caulking comp...

Страница 13: ...inent location inside manufactured home until on site installation 4 The four warning tags supplied must be installed as follows To weather cap To fuel line connection point Gas or furnace burner Oil...

Страница 14: ...operly connected as shown in Figure 25 Route all electrical wiring to the left side of the furnace See Figure 24 For installation of A Cabinet furnaces allow sufficient slack in the wiring if an optio...

Страница 15: ...above the control panel 2 Connectthethermostatwirestothefurnacelowvoltage pigtails see Figure 25 3 Connect low voltage circuit to the wall thermostat 4 A hole may be made in the furnace cabinet to eas...

Страница 16: ...or property damage This furnace may be installed with left right or bottom gas entry When connecting the gas supply provide clearance between the gas supply line and the entry hole in the furnace casi...

Страница 17: ...t pressure Pressure is reduced to 3 1 2 W C by the pressure regulator in the gas valve The maximum inlet pressure for the valve is 7 W C and the minimum inlet pressure is 4 5 W C For L P gas pressure...

Страница 18: ...o Line system should only be used if vertical lift exceeds 8 feet 1 Install the oil feed line as outlined in steps 1 6 below 2 Install the oil pump bypass plug in the bottom return port 3 Route the re...

Страница 19: ...P gas Use the following procedure for gas conversion of the burner Atmospheric Direct Ignition Furnaces 1 Follow the instructions How to Shut Off Gas page 22 2 Disconnect the gas pipe union and the el...

Страница 20: ...nace installation A flue gas sample may be taken from the heat exchanger which is located behind the hole of the top front of blower compartment 1 Turn off all electric power to the appliance 2 Remove...

Страница 21: ...sonne ne r pond appeler le service des incendies AVERTISSEMENT STARTUP ADJUSTMENTS PLEASE READ ALL SAFETY INFORMATION BEFORE LIGHTING THE FURNACE WARNING Before placing the furnace in service it must...

Страница 22: ...est setting 2 Turn off all electric power to the appliance before servicing unit 3 Set the furnace On Off Switch to OFF Honeywell Figure 30 Turn gas control knob clockwise to OFF Robertshaw Figure 31...

Страница 23: ...mbustion Air CAUTION Combustionairadjustmentmustbemadeonly by a qualified technician Improper air adjust ment may cause unsafe operation explosion and or fire asphyxiation If the input to the furnace...

Страница 24: ...the gas valve 3 Aftera45secondpurge theignitorisenergizedfora30 second warm up period After warm up the gas valve opens NOTE The time for ignition is approximately 6 seconds after which the gas valve...

Страница 25: ...ch must be set in the ON position for the furnace to operate If blower operation is not desired the furnace On Off switch may be set in the OFF position to cut the electrical power to the furnace See...

Страница 26: ...RX1 scale Normal reading should be 40 75 ohms If above or below this rating at room temperature change ignitor 3 Check for continuity from ignitor receptacle to burner Control Module is Powered Ignito...

Страница 27: ...attheigniterterminals andthere is no ignition the igniter is likely defective and needs to be replaced 3 If the stops flashing burner turns on but the control locks out again check the cad cell If the...

Страница 28: ...L1 neutral reversed or L1 voltage not present on L1 Flame Status A Yellow LED labeled Flame is provided to indicate flame status When flame is sensed the flame LED is lit If flame sense is weak yello...

Страница 29: ...roper furnace operation Excessive ice formation could restrict the combustion air supply to the burner causing inefficient burner operation If excessive ice has formed on the air inlet or exhaust port...

Страница 30: ...26 43 0 3 x x 1 4 3 M1BC 066 66 53 26 43 0 3 x x 1 2 4 M1BB 086 86 68 18 37 0 3 x x 1 4 3 M1BC 086 86 68 18 37 0 3 x x 1 2 4 M5SB 066 66 56 0 3 50 Gph x Burner Model AF 10 1 4 3 M5SC 066 66 56 0 3 50...

Страница 31: ...45 4 41 8 40 1 38 5 37 0 35 5 34 1 32 7 31 4 30 2 M1M 070 Orifice Size Nat Gas 24 25 26 27 27 28 28 29 29 30 Orifice Size LP 42 42 43 43 43 44 44 45 46 47 Output MBTUH 56 7 52 3 50 2 48 2 46 2 44 4 42...

Страница 32: ...84 43 214 429 86 42 209 419 88 41 205 409 90 40 200 400 92 39 196 391 94 38 191 383 96 38 188 375 98 37 184 367 100 36 180 360 102 35 176 353 104 35 173 346 106 34 170 340 108 33 167 333 110 33 164 3...

Страница 33: ...is required for M1MA models and M1MB 090 A C Heating Speeds Refer to Table 12 A C Blower Selection in the manual BLACK WHITE WHITE BLACK BLACK GREEN RED GRAY WHITE RED LO BLACK HIGH BLUE MED HI ORANGE...

Страница 34: ...RD TERMINAL BUSHING BUSHING BUSHING BUSHING W C IGNITER FROM C WIRE GRAY BLACK BLACK FROM W WIRE BLUE GAS GUN BURNER GV PSO FSG C IND L 1 HSI HSIG L 2 W PSI FSI CONTROL MODULE IGNITER L2 MOTOR L2 L2 L...

Страница 35: ...35...

Страница 36: ...ATE UNIT MODEL UNIT SERIAL Minimum clearances per Table 1 page 6 YES NO Has the owner s information been reviewed with the home owner YES NO Has the literature package been left near the furnace YES N...

Отзывы: