Adjusting the pressure control valve
Installation
3-22
Part 1032059B
E
2003 Nordson Corporation
Manual 41-DURABLUE-MA-02
Installing Optional Equipment
Each item of optional equipment is shipped with instructions for installing
and operating the equipment. Refer to Section 7, Parts, for equipment part
numbers.
Connecting a Gun Driver, Pattern Controller, or
Timer
If applicable, complete the melter installation by connecting the guns to the
desired gun driver, pattern control, or timer. Refer to the product manual
provided with the device for information about installing and operating the
equipment.
Flushing the Melter
WARNING: Risk of Burns! New melters contain a small quantity of
low-viscosity test fluid. Test fluid may splatter when discharged under high
pressure. Before flushing the melter, ensure that the pressure control valve
is set to low pressure.
Before using the melter for production, it should be flushed to remove any
residue left over from factory-testing. Flushing the melter is accomplished
by processing a minimum of one tank volume of hot melt through the melter,
hoses, and guns.
Refer to Section 4, Operation, for information about filling the tank and
operating the melter.
Adjusting the Pressure Control Valve
NOTE: The pressure control valve screw is turned fully counterclockwise
(at or near the valve’s lowest pressure setting) at the factory and then the
lock nut is tightened.
Before placing the melter into routine operation, loosen the lock nut and
adjust the pressure control valve to achieve the desired adhesive output
rate for your manufacturing process. With the line running and the guns
dispensing adhesive, turn the adjustment screw on the pressure control
valve
S
clockwise to increase the adhesive output
S
counterclockwise to decrease the adhesive output
Содержание DuraBlue D10L
Страница 91: ...Troubleshooting 6 11 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 93: ...Troubleshooting 6 13 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 95: ...Troubleshooting 6 15 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 97: ...Troubleshooting 6 17 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 99: ...Troubleshooting 6 19 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 101: ...Troubleshooting 6 21 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 103: ...Troubleshooting 6 23 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 105: ...Troubleshooting 6 25 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 107: ...Troubleshooting 6 27 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 109: ...Troubleshooting 6 29 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 111: ...Troubleshooting 6 31 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 113: ...Troubleshooting 6 33 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 115: ...Troubleshooting 6 35 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02...
Страница 131: ...Parts 7 13 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02 This page intentionally left blank...
Страница 136: ...Parts 7 18 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02 This page intentionally left blank...
Страница 142: ...Technical Data 8 6 Part 1032059B E 2003 Nordson Corporation Manual 41 DURABLUE MA 02 This page intentionally left blank...