4103270
Installation
A 1-67
E
2000 Nordson Corporation
All rights reserved
41-3000
V
Issued 5/00
A3EN-04-[3V-A-AAXP]-12
Follow these procedures to flush the system and prepare it for first
operation. This part of the
Installation
section also includes the
procedure for adjusting the pressure control valve on gear pump units.
WARNING:
Allow only qualified personnel to operate the unit.
Use this procedure to fill the tank with unmelted adhesive. Before
continuing, refer to
General Hot Melt Material Processing Instructions
at
the beginning of this manual.
1. If you have not already done so, program your unit. Refer to
System
Programming Procedures
in this section.
2. Open the tank lid.
WARNING:
Use a metal or plastic scoop to fill the tank with
adhesive. Never use your bare hands.
3. See Figure A 1-43. Use a metal or plastic scoop and fill the tank with
adhesive to within 25 mm (1 in.) of the top of the tank.
4. Close the tank lid.
5. As the system scans through the system settings, check that all
temperatures are set as recommended by your adhesive supplier.
6. Go to the next procedure,
Flushing the System
.
Fig. A 1-43 Filling the Tank with
Adhesive
9. System Preparation
Filling the Tank with Adhesive