Installation
A 1-31
E
2000 Nordson Corporation
All rights reserved
41-3000
V
Issued 5/00
A3EN-04-[3V-A-AAXP]-12
7. Route the electrical service line to the unit.
WARNING:
Use the proper length of cable. Inadequate wire
length could result in disconnection at TB1 when you open the
operator panel. Excess wiring can be pinched when you close
the panel, causing equipment damage, personal injury, or
death.
8. See Figure A 1-20. Route the electrical service line through the strain
relief, determine the length of cable required to reach terminal
block TB1 and the ground terminal, and cut the cable.
4130764
1
2
Fig. A 1-20 Routing the Electrical Service Line Through the Strain Relief
1. Strain relief
2. Electrical service line