PRE-OPERATION/STARTUP
Super Claws Model LS-2
Section 3-18
MAR/2006 (4945-3500)
PREOPERATIONAL CHECKLIST
Nordco recommends that the following checks be performed WITHOUT electrical power, due to a possible battery
drain.
;
Control Box Cover Unlocked and Hooked in Position
;
Control Box Switches and Gauges:
ITEM
SHOULD
BE
;
Circuit Breakers (Inside Control Box)
Pushed
In
;
All Gauges
Glass not broken
;
Emergency Stop Pushbutton
Pulled
Out
;
Work Lights Switch
OFF
(down)
;
Travel Lights Switch
OFF
(centered)
;
Ignition Switch
OFF
Position
;
Engine Speed Switch
LOW
(down)
;
Hydraulic Tank Full (See Recommended Lubricants)
;
Fuel Tank Full (Use only Diesel Fuel)
;
Engine Oil Full (See Recommended Lubricants in Maintenance Section)
;
Inspect for Leaks. Pay particular attention to hydraulic and fuel lines.
;
Inspect all controls, wiring and switches for secure mounting
;
Make certain Mechanical Lock-Up devices are in place (for traveling)
;
Battery Disconnect Switch OFF (Switch located in box)
;
Shutdown Override Switch OFF
;
Electrical Interlock/Warmup Switch PUSHED IN
;
Pump Switch OFF
Содержание Super Claws LS-2
Страница 2: ......
Страница 16: ...GENERAL Super Claws Model LS 2 Section 2 4 MAR 2006 4945 3500 Page Intentionally Left Blank ...
Страница 19: ...Super Claws Model LS 2 PRE OPERATION STARTUP MAR 2006 4945 3500 Section 3 3 MAIN CONTROL PANEL ...
Страница 30: ...PRE OPERATION STARTUP Super Claws Model LS 2 Section 3 14 MAR 2006 4945 3500 OPERATOR CONTROLS HAND CONTROLS ...
Страница 44: ...OPERATION SHUTDOWN Super Claws Model LS 2 Section 4 6 MAR 2006 4945 3500 This page intentionally left blank ...
Страница 76: ......