Super Claws Model LS-2
PRE-OPERATION/STARTUP
MAR/2006 (4945-3500)
Section 3-17
PREPARING FOR OPERATION
1.
Position the machine on level track so fluid levels can be accurately
checked and filled if necessary.
2.
See TOWING section if machine is to be towed to worksite.
3.
Perform the pre-operational inspection of the entire machine specified on
the next page. Find defects and correct them before serious damage or
failure results.
4.
If necessary, follow any applicable instructions under MAINTENANCE FOR
EXTREME CONDITIONS.
5.
Know and understand the use of all machine controls and instruments as
described earlier in this Section.
6.
Perform applicable preventative-maintenance procedures in
MAINTENANCE AND SERVICE section.
7.
Be ready to operate the machine with an alert and safety-conscious
attitude.
8.
Understand the use of the machine's Lock-Ups. See LOCK-UPS section.
9.
Make sure the unit is setup for rail size being worked on. Adjustments, if
required, are described in Section 04 - MACHINE SETUP.
10.
Wear proper safety clothing.
Содержание Super Claws LS-2
Страница 2: ......
Страница 16: ...GENERAL Super Claws Model LS 2 Section 2 4 MAR 2006 4945 3500 Page Intentionally Left Blank ...
Страница 19: ...Super Claws Model LS 2 PRE OPERATION STARTUP MAR 2006 4945 3500 Section 3 3 MAIN CONTROL PANEL ...
Страница 30: ...PRE OPERATION STARTUP Super Claws Model LS 2 Section 3 14 MAR 2006 4945 3500 OPERATOR CONTROLS HAND CONTROLS ...
Страница 44: ...OPERATION SHUTDOWN Super Claws Model LS 2 Section 4 6 MAR 2006 4945 3500 This page intentionally left blank ...
Страница 76: ......