10
4.3 W
ING
S
ENSOR
I
NSTALLATION
1.
Assemble
the
Breakaway
Sensor
Mounting Brackets (
B11
) as show in
Figure 4
and
Figure 5
.
Figure 4 – Breakaway Sensor Bracket
Exploded View
Figure 5 – Breakaway Sensor Mounting
Bracket Assembly
To assemble the breakaway sensor
bracket:
a)
Assemble the bolt and nut into the
collar.
b)
Grease the bottom edge of the collar
and the angled tube of the base.
c)
Place the collar onto the angled tube
of the mounting base.
d)
Install the spring between the collar
and the upper ring of the base.
e)
Insert tube through assembly and
tighten the collar
2.
Mount the sensor bracket onto the boom.
If possible, mount the sensor
brackets while the booms are in
their folded position to ensure that
they
will
not
interfere
with
anything when the boom is folded
for transport.
3.
The mounting brackets can be installed
with the mounting base behind (
Figure
8
) or in front of the tube (
Figure 6
).
Mounting the sensor bracket to
the break-away section of the
boom may cause the boom to drop
suddenly as a break-away occurs.
This will occur on break-away
sections which lift as they break
away.
For optimal boom tip protection, it
is recommended that the sensor be
mounted within approximately
two feet (60cm) of the boom tip.
Please refer to the UC4+ system
warranty at the end of the
UC4+
Sprayer Boom Control Operator’s
Manual
(
M01
) for implications.
4.
Mount the NORAC UC4+ ultrasonic
sensor (
E02
) into the sensor brackets.
The sensors should be oriented forward
(ahead) of the boom (see
Figure 6
and
Figure 8
)
Содержание FLEXI-COIL 67 Series
Страница 10: ...7 Figure 3 Hydraulic Plumbing Schematic ...
Страница 15: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Страница 30: ...5 3 ITEM C02 44668 SENSOR BRANCH CABLE 5 4 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL ...
Страница 31: ...5 5 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT 5 6 ITEM C04 44651 VALVE EXTENSION CABLE ...
Страница 32: ...5 7 ITEM C10 44650 09 POWER CABLE FOR FLEXI COIL 67 SERIES ...